Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Bond 2020 – ORG#059 L.V. Stockard Middle School
2300 S. Ravinia Drive, Dallas, TX 75211, Dallas, TX, 75211
Bond 2020 – ORG#059 L.V. Stockard Middle School is a renovation/alteration project at 2300 S. Ravinia Drive, Dallas, TX 75211, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $9.7M across about 115,230 sq ft.
- Estimated project value
- $9.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 115,230 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $84/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
124 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75211 (Dallas)
One email per change. Unsubscribe in one click. Privacy.
Bond 2020 – ORG#059 L.V. Stockard Middle School is a Renovation/Alteration project located at 2300 S. Ravinia Drive, Dallas, TX 75211, Dallas, TX 75211 in Dallas, Texas. The project has an estimated value of $9.7M covering 115,230 sq ft. Dallas Independent School District (Dallas ISD) is the property owner and KAI Design is the design firm of record. The project was registered with TDLR on July 2, 2025.
Frequently Asked Questions
What is Bond 2020 – ORG#059 L.V. Stockard Middle School?
Bond 2020 – ORG#059 L.V. Stockard Middle School is a renovation/alteration project at 2300 S. Ravinia Drive, Dallas, TX 75211 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install secure entry vestibule, upgrade fire alarm system, add security cameras, card readers, and door sensors. Renovate admin and clinic areas, refresh interior finishes in corridors and classrooms, and improve some amenities for acces…
Is Bond 2020 – ORG#059 L.V. Stockard Middle School open in Dallas?
Bond 2020 – ORG#059 L.V. Stockard Middle School is still under construction in Dallas, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Bond 2020 – ORG#059 L.V. Stockard Middle School located?
Bond 2020 – ORG#059 L.V. Stockard Middle School is located at 2300 S. Ravinia Drive, Dallas, TX 75211, Dallas, TX, 75211, in Dallas County.
Who is the owner or developer of Bond 2020 – ORG#059 L.V. Stockard Middle School?
Dallas Independent School District (Dallas ISD) is the property owner/developer of record for Bond 2020 – ORG#059 L.V. Stockard Middle School, per its TDLR project registration.
Who is the architect or design firm for Bond 2020 – ORG#059 L.V. Stockard Middle School?
KAI Design is the design firm of record for Bond 2020 – ORG#059 L.V. Stockard Middle School, according to its TDLR filing.
How much does Bond 2020 – ORG#059 L.V. Stockard Middle School cost and how big is it?
Bond 2020 – ORG#059 L.V. Stockard Middle School has an estimated construction value of $9.7M and approximately 115,230 square feet (about $84/sqft), based on its TDLR filing.
Scope of Work
Install secure entry vestibule, upgrade fire alarm system, add security cameras, card readers, and door sensors. Renovate admin and clinic areas, refresh interior finishes in corridors and classrooms, and improve some amenities for accessibility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2300 S. Ravinia Drive, Dallas, TX 75211, Dallas, TX, 75211
Watch all construction in 75211 (Dallas)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dallas?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.