Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Playground resurfacing project in Austin, TX
6401 Cedar St., Austin, TX, 78746
Playground resurfacing project is a renovation/alteration project at 6401 Cedar St., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2025). The project has an estimated value of $800K across about 32,600 sq ft.
- Estimated project value
- $800K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 32,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $25/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
39 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Playground resurfacing project
Bridgepoint Elementary School completed a playground resurfacing project at 6401 Cedar St. in Austin’s Lakeside neighborhood. The renovation covered 32,600 square feet, replacing artificial turf with poured-in-place rubber. Eanes Independent School District owned the project, which was registered with TDLR in July 2025. The Texas Department of Licensing and Regulation closed the project file in July 2025, marking the end of the accessibility review process for this construction.
The filing listed an estimated cost of $800,000. This figure places the project in the top quarter of estimated costs for renovation and alteration filings in Travis County, where the median is $299,550. The cost per square foot was $25, which is below the county median of $103 per square foot. The scheduled build window of 39 days was shorter than the county median of 98 days for similar projects.
Project Details
LJA Engineering served as the design firm of record. Mark S Robinson was the registered accessibility specialist. The project involved public funds and public land. It was registered in July 2025, with a scheduled completion date of August 2025.
Eanes Independent School District has six other TDLR-registered projects totaling $5,676,000. These include renovations at Eanes Elementary School and the Eanes ISD Administration Building. LJA Engineering has six other registered projects totaling $9,024,995, including the N/A project in Austin and Williford Road in Sachse. Other renovation projects in the Lakeside area include San Clemente and Plaza on the Lake.
City of Austin permit records show four permits on file at this street address, issued between June 2024 and September 2024. These include two electrical permits and two building permits. The most recent permits involved installing a new 479.67 kW solar rooftop system and partial window replacement. These permits are associated with the address and do not necessarily reflect this specific playground project.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78746 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Playground resurfacing project is a Renovation/Alteration project located at 6401 Cedar St., Austin, TX 78746 in Austin, Texas. The project has an estimated value of $800K covering 32,600 sq ft. Eanes Independent School District is the property owner and LJA Engineering is the design firm of record. The project was registered with TDLR on July 3, 2025.
Frequently Asked Questions
Who owns the Bridgepoint Elementary School playground project?
Eanes Independent School District is the owner of record for the playground resurfacing project at 6401 Cedar St. in Austin.
What is the current status of the TDLR filing?
TDLR closed the project file in July 2025, which marks the end of the accessibility review process for this construction.
How much did the playground resurfacing cost?
The estimated cost for the 32,600 square foot playground resurfacing project was $800,000.
Who was the design firm for this project?
LJA Engineering was the design firm of record for the Bridgepoint Elementary School playground renovation.
What is Playground resurfacing project?
Playground resurfacing project is a renovation/alteration project at 6401 Cedar St. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Resurfacing of an existing playground from artificial turf to poured in place rubber - 32,600SF
Is Playground resurfacing project open in Austin?
Construction on Playground resurfacing project is complete — TDLR records show the project passed its required accessibility inspection in Jul 2025. The building is finished and very likely open.
Where is Playground resurfacing project located?
Playground resurfacing project is located at 6401 Cedar St., Austin, TX, 78746, in Travis County.
Who is the owner or developer of Playground resurfacing project?
Eanes Independent School District is the property owner/developer of record for Playground resurfacing project, per its TDLR project registration.
Who is the architect or design firm for Playground resurfacing project?
LJA Engineering is the design firm of record for Playground resurfacing project, according to its TDLR filing.
How much does Playground resurfacing project cost and how big is it?
Playground resurfacing project has an estimated construction value of $800K and approximately 32,600 square feet (about $25/sqft), based on its TDLR filing.
Scope of Work
Resurfacing of an existing playground from artificial turf to poured in place rubber - 32,600SF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6401 Cedar St., Austin, TX, 78746
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$35.8M totalRelated City Permits
Building permits found at or near this location
Construct new driveway approach of 16 FT. No sidewalk inspection per plan review.
New construction of a single-story SF residence with porch patio attached garage. Please reference approved PUD 3/2
homebuilder loop single residence
HOMEBUILDER LOOP ref BP 2026-142600
New construction of a single-story SF residence with porch patio attached garage. Please reference approved PUD 3/2
Watch all construction in 78746 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.