Project intelligenceTDLR TABS2025023072New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Kingsville Fire Station #3

2602 S 6th Street, Kingsville, TX, 78363

Target date passed (Aug 2026)Review Complete

Kingsville Fire Station #3 is a new construction project at 2602 S 6th Street, Kingsville, in Kleberg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $8.3M across about 14,357 sq ft.

Estimated project value
$8.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,357 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$575/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 9, 2025397 days across supplied datesAug 10, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    371 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Kingsville Fire Station #3

Kingsville Fire Station #3 is a new 14,357 sq ft facility at 2602 S 6th Street in Kingsville, Kleberg County. The City of Kingsville is the owner of record for this $8,250,000 project, which includes two apparatus bays, sleeping rooms for eight personnel, offices for four staff, a conference room, a back-up EOC, a dayroom, a kitchen, and a dining room.

TDLR registered the project in July 2025, completing plan review in the same month. Construction was scheduled to begin in August 2025 and finish in August 2026. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Cost and Scope Comparison

The estimated cost of $575 per square foot is above the county median of $222 for new construction filings in Kleberg County. The total value of $8,250,000 is above the median estimated cost of $760,000 for similar projects in the area. The scheduled build window of 371 days is longer than the county median of 214 days, reflecting the complex nature of the facility.

Location and Context

The site is located inside a FEMA Special Flood Hazard Area (zone AE, floodway). The City of Kingsville has three other TDLR-registered projects totaling $1,996,291, including a $1,346,291 project with review complete. A Facebook post by KingsvilleFireDept referenced a groundbreaking ceremony for this station, and Johnston Industries lists Kingsville Fire Station #3 in its completed project portfolio.

Residents of ZIP 78363, with a population of about 28,820, will benefit from this new infrastructure. The project utilizes public funds and public land. Other nearby registered projects include renovations at CHRISTUS Spohn Hospital - Kleberg and new construction for Westican Outdoors, highlighting ongoing development in the area.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78363 (Kingsville)

One email per change. Unsubscribe in one click. Privacy.

Kingsville Fire Station #3 is a New Construction project located at 2602 S 6th Street in Kingsville, Texas. The project has an estimated value of $8.3M covering 14,357 sq ft. City of Kingsville is the property owner. The project was registered with TDLR on July 9, 2025.

Frequently Asked Questions

Is Kingsville Fire Station #3 open?

TDLR has not yet recorded a final inspection, so the site's status is not confirmed. A Facebook post by KingsvilleFireDept mentioned a groundbreaking ceremony, but no official opening date is listed in the public record.

Where is Kingsville Fire Station #3 located?

The station is at 2602 S 6th Street in Kingsville, Kleberg County, Texas. It is situated within a FEMA Special Flood Hazard Area, which may affect local drainage and infrastructure planning.

How much does Kingsville Fire Station #3 cost?

The estimated cost is $8,250,000. This amount is above the median cost for new construction in Kleberg County, reflecting the facility's size and the inclusion of multiple functional areas like apparatus bays and offices.

Who is the owner of Kingsville Fire Station #3?

The City of Kingsville is the owner of record. The project involves public funds and public land, and it is one of several TDLR-registered projects associated with the city in recent years.

When was Kingsville Fire Station #3 scheduled to finish?

Construction was scheduled to finish in August 2026. However, TDLR has not yet recorded a final inspection, meaning the completion status is not verified in the current public record.

What is Kingsville Fire Station #3?

Kingsville Fire Station #3 is a new construction project at 2602 S 6th Street in Kingsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This fire station consists of two apparatus bays, sleeping rooms for eight personnel, offices for four staff members, a conference room, a back-up EOC, a dayroom, a kitchen, and a dining room.

Is Kingsville Fire Station #3 open in Kingsville?

Kingsville Fire Station #3 was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Who is the owner or developer of Kingsville Fire Station #3?

City of Kingsville is the property owner/developer of record for Kingsville Fire Station #3, per its TDLR project registration.

How much does Kingsville Fire Station #3 cost and how big is it?

Kingsville Fire Station #3 has an estimated construction value of $8.3M and approximately 14,357 square feet (about $575/sqft), based on its TDLR filing.

Scope of Work

This fire station consists of two apparatus bays, sleeping rooms for eight personnel, offices for four staff members, a conference room, a back-up EOC, a dayroom, a kitchen, and a dining room.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2602 S 6th Street, Kingsville, TX, 78363

Loading location map…
27.47031, -97.86570

Watch all construction in 78363 (Kingsville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Kingsville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.