Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Kingsville Sidewalk Project (CSJ: 0916-02-025)
Along W. Johnston Ave and S. Armstrong St, Kingsville, TX, 78363
Kingsville Sidewalk Project (CSJ: 0916-02-025) is a new construction project at Along W. Johnston Ave and S. Armstrong St, Kingsville, in Kleberg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2029. The project has an estimated value of $1.3M across about 58,000 sq ft.
- Estimated project value
- $1.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 58,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $23/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 years
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
463 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
729 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Kingsville Sidewalk Project (CSJ: 0916-02-025)
The Kingsville Sidewalk Project (CSJ: 0916-02-025) is a new construction effort along W. Johnston Ave and S. Armstrong St in Kingsville, Texas. The scope covers the construction of sidewalks, ADA ramps, and pedestrian elements, along with drainage, landscaping, and traffic improvements. The project spans 58,000 square feet and has an estimated cost of $1,346,291.
Project Status and Timeline
TDLR completed plan review in March 2026, and the project is scheduled to finish in June 2029. Construction is slated to begin in July 2027. This timeline places the scheduled build window at 729 days, which is longer than the median of 214 days for similar new construction filings in Kleberg County. The TDLR status is listed as Review Complete.
The City of Kingsville is the owner and developer of record for this project. LJA Engineering, Inc. serves as the design firm of record. Frank Fonseca is the registered accessibility specialist associated with the filing. The project involves public funds, public land, or is a Federally funded roadway project, and it is registered with TDLR.
Location and Context
The surrounding area includes local businesses such as Eloy's Barber Salon, Fellowship of Christian Families, and Uselton General Labor & Construction. According to U.S. Census ACS 2023 five-year estimates for ZIP code 78363, the population is about 28,820, with a median household income of $56,867. The median owner-occupied home value is $155,900, and housing is an even mix of owner- and renter-occupied.
The estimated cost of $1,346,291 is above the county median of $760,000 for new construction projects in Kleberg County. However, the cost per square foot is $23, which is below the county median of $222 per square foot. The City of Kingsville has three other TDLR-registered projects totaling $8,900,000, including the Kingsville Fire Station #3 and renovations to sidewalks and curbs.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78363 (Kingsville)
One email per change. Unsubscribe in one click. Privacy.
Kingsville Sidewalk Project (CSJ: 0916-02-025) is a New Construction project located at Along W. Johnston Ave and S. Armstrong St, Kingsville, TX 78363 in Kingsville, Texas. The project has an estimated value of $1.3M covering 58,000 sq ft. City of Kingsville is the property owner and LJA Engineering, Inc. is the design firm of record. The project was registered with TDLR on February 25, 2026.
Frequently Asked Questions
Where is the Kingsville Sidewalk Project located?
The project is located along W. Johnston Ave and S. Armstrong St in Kingsville, Texas, within Kleberg County.
What is the estimated cost of the project?
The estimated cost is $1,346,291. This figure is above the median estimated cost for similar new construction filings in Kleberg County.
When is construction scheduled to start and finish?
Construction is scheduled to start in July 2027 and is scheduled to finish in June 2029.
Who is the owner and design firm for this project?
The City of Kingsville is the owner of record, and LJA Engineering, Inc. is the design firm of record.
What does the scope of work include?
The scope includes construction of sidewalks, ADA ramps, and pedestrian elements, as well as drainage, landscaping, and traffic elements.
What is Kingsville Sidewalk Project (CSJ: 0916-02-025)?
Kingsville Sidewalk Project (CSJ: 0916-02-025) is a new construction project at Along W. Johnston Ave and S. Armstrong St in Kingsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalk, ADA ramps and pedestrian elements. Drainage, landscaping and traffic elements.
Is Kingsville Sidewalk Project (CSJ: 0916-02-025) open in Kingsville?
Kingsville Sidewalk Project (CSJ: 0916-02-025) is still under construction in Kingsville, TX, with an estimated completion of Jun 2029 according to its TDLR registration.
Where is Kingsville Sidewalk Project (CSJ: 0916-02-025) located?
Kingsville Sidewalk Project (CSJ: 0916-02-025) is located at Along W. Johnston Ave and S. Armstrong St, Kingsville, TX, 78363, in Kleberg County.
Who is the owner or developer of Kingsville Sidewalk Project (CSJ: 0916-02-025)?
City of Kingsville is the property owner/developer of record for Kingsville Sidewalk Project (CSJ: 0916-02-025), per its TDLR project registration.
Who is the architect or design firm for Kingsville Sidewalk Project (CSJ: 0916-02-025)?
LJA Engineering, Inc. is the design firm of record for Kingsville Sidewalk Project (CSJ: 0916-02-025), according to its TDLR filing.
How much does Kingsville Sidewalk Project (CSJ: 0916-02-025) cost and how big is it?
Kingsville Sidewalk Project (CSJ: 0916-02-025) has an estimated construction value of $1.3M and approximately 58,000 square feet (about $23/sqft), based on its TDLR filing.
Scope of Work
Construction of sidewalk, ADA ramps and pedestrian elements. Drainage, landscaping and traffic elements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Along W. Johnston Ave and S. Armstrong St, Kingsville, TX, 78363
Related Projects
Same Owner
$11.2M totalWatch all construction in 78363 (Kingsville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Kingsville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.