Project intelligenceTDLR TABS2025023248Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Joshua HS CTE Addition and Renovation

909 S Broadway St, Joshua, TX, 76058

Opening ~Dec 2026Project Registered

Joshua HS CTE Addition and Renovation is a additions to existing building project at 909 S Broadway St, Joshua, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $25.0M across about 56,000 sq ft.

Estimated project value
$25.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
56,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$446/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 11, 2025533 days across supplied datesDec 26, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    512 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76058 (Joshua)

One email per change. Unsubscribe in one click. Privacy.

Joshua HS CTE Addition and Renovation is a Additions to Existing Building project located at 909 S Broadway St in Joshua, Texas. The project has an estimated value of $25.0M covering 56,000 sq ft. Joshua ISD is the property owner and WRA Architects Inc. is the design firm of record. The project was registered with TDLR on July 11, 2025.

Frequently Asked Questions

What is Joshua HS CTE Addition and Renovation?

Joshua HS CTE Addition and Renovation is a additions to existing building project at 909 S Broadway St in Joshua, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of renovations to the existing CTE building and a 2 story storm shelter addition. Existing renovation area is 25,000 SF and the 2 story addition is 31,000 SF.

Is Joshua HS CTE Addition and Renovation open in Joshua?

Joshua HS CTE Addition and Renovation is still under construction in Joshua, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Joshua HS CTE Addition and Renovation located?

Joshua HS CTE Addition and Renovation is located at 909 S Broadway St, Joshua, TX, 76058, in Johnson County.

Who is the owner or developer of Joshua HS CTE Addition and Renovation?

Joshua ISD is the property owner/developer of record for Joshua HS CTE Addition and Renovation, per its TDLR project registration.

Who is the architect or design firm for Joshua HS CTE Addition and Renovation?

WRA Architects Inc. is the design firm of record for Joshua HS CTE Addition and Renovation, according to its TDLR filing.

How much does Joshua HS CTE Addition and Renovation cost and how big is it?

Joshua HS CTE Addition and Renovation has an estimated construction value of $25.0M and approximately 56,000 square feet (about $446/sqft), based on its TDLR filing.

Scope of Work

Project consists of renovations to the existing CTE building and a 2 story storm shelter addition. Existing renovation area is 25,000 SF and the 2 story addition is 31,000 SF.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

909 S Broadway St, Joshua, TX, 76058

32.45351, -97.38426

Watch all construction in 76058 (Joshua)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.