Project intelligenceTDLR TABS2025016226Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Joshua ISD HS Kitchen/Cafeteria Addn & Reno

909 S Broadway St, Joshua, TX, 76058

Target date passed (Aug 2026)Review Complete

Joshua ISD HS Kitchen/Cafeteria Addn & Reno is a additions to existing building project at 909 S Broadway St, Joshua, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $13.0M across about 28,100 sq ft.

Estimated project value
$13.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
28,100 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$463/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 9, 2025508 days across supplied datesAug 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    457 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Joshua ISD HS Kitchen/Cafeteria Addn & Reno

The Joshua ISD High School project involves a 28,100 sq ft renovation and addition at 909 S Broadway St in Johnson County. The filing identifies the scope as a complete renovation of a classroom and cafeteria building, including an expansion to increase seating capacity on the high school campus. The estimated cost for this work is $13,024,000.

Joshua ISD is the owner of record, with WRA Architects serving as the design firm. Ernesto Sarabia is listed as the registered accessibility specialist. The project is funded with public funds and registered with the Texas Department of Licensing and Regulation (TDLR). Plan review was completed in April 2025, and construction was scheduled to begin in May 2025.

Project Scale and Cost Context

At $463 per square foot, this project’s cost per square foot is above the county median of $119 for similar additions to existing buildings. The estimated total cost places the project in the top quarter of the 83 comparable filings in Johnson County. The scheduled build window of 457 days is longer than the county median of 208 days. This scale reflects the comprehensive nature of the renovation and the addition of new seating space.

The project is part of a broader development effort by Joshua ISD, which has four other TDLR-registered projects totaling $80,237,600. These include the Joshua HS CTE facility and a new elementary school in Burleson. WRA Architects has six other registered projects totaling $43,337,515, including facilities in Denison and Mansfield.

TDLR has not yet recorded a final inspection for this project. The completion date on the filing was August 2026, but the current state of the site is not confirmed in the public record. The project status remains Review Complete, indicating that the planning phase is finished but final construction verification is pending in the official records.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76058 (Joshua)

One email per change. Unsubscribe in one click. Privacy.

Joshua ISD HS Kitchen/Cafeteria Addn & Reno is a Additions to Existing Building project located at 909 S Broadway St in Joshua, Texas. The project has an estimated value of $13.0M covering 28,100 sq ft. Joshua ISD is the property owner and WRA Architects is the design firm of record. The project was registered with TDLR on April 9, 2025.

Frequently Asked Questions

Is the Joshua ISD High School renovation open?

The TDLR record shows the project has not yet recorded a final inspection. Construction status and business opening are different; the public record does not confirm that the facility is open for use.

Who is designing the Joshua ISD High School project?

WRA Architects is the design firm of record for the 28,100 sq ft renovation and addition at 909 S Broadway St in Joshua, Texas.

What is the estimated cost of the high school renovation?

The estimated cost for the Joshua ISD High School kitchen and cafeteria addition and renovation is $13,024,000, which is above the county median for similar projects.

When was the project registered with TDLR?

The project was registered with the Texas Department of Licensing and Regulation in April 2025, and plan review was completed in the same month.

What is Joshua ISD HS Kitchen/Cafeteria Addn & Reno?

Joshua ISD HS Kitchen/Cafeteria Addn & Reno is a additions to existing building project at 909 S Broadway St in Joshua, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of a 28,100 SF complete renovation of a classroom and cafeteria building along with an addition to expand cafeteria seating capacity on the high school campus in Joshua, Texas. The building shall be separated from t…

Is Joshua ISD HS Kitchen/Cafeteria Addn & Reno open in Joshua?

Joshua ISD HS Kitchen/Cafeteria Addn & Reno was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Joshua ISD HS Kitchen/Cafeteria Addn & Reno located?

Joshua ISD HS Kitchen/Cafeteria Addn & Reno is located at 909 S Broadway St, Joshua, TX, 76058, in Johnson County.

Who is the owner or developer of Joshua ISD HS Kitchen/Cafeteria Addn & Reno?

Joshua ISD is the property owner/developer of record for Joshua ISD HS Kitchen/Cafeteria Addn & Reno, per its TDLR project registration.

Who is the architect or design firm for Joshua ISD HS Kitchen/Cafeteria Addn & Reno?

WRA Architects is the design firm of record for Joshua ISD HS Kitchen/Cafeteria Addn & Reno, according to its TDLR filing.

How much does Joshua ISD HS Kitchen/Cafeteria Addn & Reno cost and how big is it?

Joshua ISD HS Kitchen/Cafeteria Addn & Reno has an estimated construction value of $13.0M and approximately 28,100 square feet (about $463/sqft), based on its TDLR filing.

Scope of Work

This project consists of a 28,100 SF complete renovation of a classroom and cafeteria building along with an addition to expand cafeteria seating capacity on the high school campus in Joshua, Texas. The building shall be separated from the rest of

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

909 S Broadway St, Joshua, TX, 76058

Loading location map…
32.45351, -97.38426

Watch all construction in 76058 (Joshua)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.