Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation
513 Henderson Street, Joshua, TX, 76058
Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation is a renovation/alteration project at 513 Henderson Street, Joshua, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $260K across about 400 sq ft.
- Estimated project value
- $260K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 400 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $650/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 23 days
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
23 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76058 (Joshua)
One email per change. Unsubscribe in one click. Privacy.
Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation is a Renovation/Alteration project located at 513 Henderson Street, Joshua, TX 76058 in Joshua, Texas. The project has an estimated value of $260K covering 400 sq ft. Joshua ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on March 28, 2023.
Frequently Asked Questions
What is Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation?
Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation is a renovation/alteration project at 513 Henderson Street in Joshua, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Controlled Vestibule Entry Renovation at Elder Elementary for Joshua ISD.
Is Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation open in Joshua?
Construction on Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation is complete — TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation located?
Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation is located at 513 Henderson Street, Joshua, TX, 76058, in Johnson County.
Who is the owner or developer of Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation?
Joshua ISD is the property owner/developer of record for Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation, per its TDLR project registration.
Who is the architect or design firm for Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation?
Huckabee is the design firm of record for Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation, according to its TDLR filing.
How much does Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation cost and how big is it?
Joshua ISD | Elder Elementary School Controlled Vestibule Entry Renovation has an estimated construction value of $260K and approximately 400 square feet (about $650/sqft), based on its TDLR filing.
Scope of Work
Controlled Vestibule Entry Renovation at Elder Elementary for Joshua ISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
513 Henderson Street, Joshua, TX, 76058
Related Projects
Same Owner
$130.3M totalWatch all construction in 76058 (Joshua)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Joshua?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.