The Vantage Phase 2 in Georgetown, TX
CR 140, Georgetown, TX, 78626
The Vantage Phase 2 is a new construction project at CR 140, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $72K across about 4,050 sq ft.
- Estimated project value
- $72K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,050 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $18/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
163 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
151 days after the preceding date shown.
Source: TDLR filing
View source record
📰About The Vantage Phase 2
The Vantage Phase 2 is a new construction project located on CR 140 in Georgetown, Texas, within Williamson County. The filing describes the scope of work as ADA improvements associated with subdivision construction. The project covers 4,050 sq ft and has an estimated cost of $72,255, which calculates to $18 per square foot. The owner of record is The Vantage Austin LLC, and the design firm of record is LJA Engineering, Inc. Blair Baker is listed as the registered accessibility specialist for this development.
The project was registered with TDLR in July 2025, and plan review was completed in the same month. Construction was scheduled to begin in January 2026, with a completion date on the filing set for June 2026. Although that date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The TDLR status remains Review Complete.
Project Context and Comparisons
This project is privately funded on private land for private use. Compared to 4,625 other TDLR-registered new construction filings in Williamson County, The Vantage Phase 2 is smaller and less expensive than the median. The median estimated cost for similar filings is $850,000, while this project’s $72,255 places it in the bottom quarter of costs. The median size for these projects is 9,006 sq ft, and the median cost per square foot is $110. The scheduled build window for this project is 151 days, which is shorter than the county median of 245 days.
The Vantage Austin LLC has two other TDLR-registered projects in Georgetown, totaling $181,404. These include The Vantage Phase 1, valued at $59,604, and another project listed as N/A, valued at $121,800. Both have completed review. LJA Engineering, Inc. has six other registered projects totaling $7,344,687, including work in Portland, Odem, and South Houston. The local area profile for ZIP code 78626, based on U.S. Census ACS 2023 five-year estimates, shows a population of about 45,020 and a median household income of $94,967.
Williamson County unemployment was 4.1 percent in July 2026, according to FRED data, which is higher than a year earlier. The project is part of a broader development effort in Georgetown, with other registered projects in the area including renovations and new construction on CR 137 and near East View High School. The specific focus on ADA improvements indicates a commitment to accessibility standards as part of the subdivision build-out.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78626 (Georgetown)
One email per change. Unsubscribe in one click. Privacy.
The Vantage Phase 2 is a New Construction project located at CR 140, Georgetown, TX 78626 in Georgetown, Texas. The project has an estimated value of $72K covering 4,050 sq ft. The Vantage Austin LLC is the property owner and LJA Engineering, Inc is the design firm of record. The project was registered with TDLR on July 22, 2025.
Frequently Asked Questions
Is The Vantage Phase 2 open for business?
The TDLR record has not yet recorded a final inspection, so the public record does not confirm that the site is finished or operating. Construction was scheduled to finish in June 2026, but the final status is unverified in the filing.
Who is the developer of The Vantage Phase 2?
The owner of record is The Vantage Austin LLC. The design firm of record is LJA Engineering, Inc., and Blair Baker is the registered accessibility specialist listed on the filing.
What is the estimated cost of the project?
The estimated cost for The Vantage Phase 2 is $72,255. This figure is for the ADA improvements associated with the 4,050 sq ft of new construction.
When was the project registered with TDLR?
The project was registered with TDLR in July 2025. Plan review was also completed in July 2025, and construction was scheduled to start in January 2026.
Where is The Vantage Phase 2 located?
The project is located at CR 140 in Georgetown, Texas 78626, within Williamson County. It is a privately funded project on private land for private use.
What is The Vantage Phase 2?
The Vantage Phase 2 is a new construction project at CR 140 in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADA improvements associated with subdivision construction
Is The Vantage Phase 2 open in Georgetown?
The Vantage Phase 2 was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Who is the owner or developer of The Vantage Phase 2?
The Vantage Austin LLC is the property owner/developer of record for The Vantage Phase 2, per its TDLR project registration.
Who is the architect or design firm for The Vantage Phase 2?
LJA Engineering, Inc is the design firm of record for The Vantage Phase 2, according to its TDLR filing.
How much does The Vantage Phase 2 cost and how big is it?
The Vantage Phase 2 has an estimated construction value of $72K and approximately 4,050 square feet (about $18/sqft), based on its TDLR filing.
Scope of Work
ADA improvements associated with subdivision construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
CR 140, Georgetown, TX, 78626
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$306K totalWatch all construction in 78626 (Georgetown)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Georgetown?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.