Project intelligenceTDLR TABS2026023683Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Memorial Parkway Hike and Bike Trail Phase 2 in Portland, TX

1900 Billy G. Webb Drive, Portland, TX, 78374

Opening ~Jul 2027Project Registered

Memorial Parkway Hike and Bike Trail Phase 2 is a renovation/alteration project at 1900 Billy G. Webb Drive, Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $613K across about 16,000 sq ft.

Estimated project value
$613K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$38/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 24, 2026378 days across supplied datesJul 7, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    197 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Memorial Parkway Hike and Bike Trail Phase 2

The City of Portland Public ROW project involves the renovation and alteration of the Memorial Parkway grassed median in Portland, Texas. The scope of work includes installing approximately 1,600 linear feet of a 10-foot-wide concrete Hike and Bike Trail. This specific phase is identified in the filing as Memorial Parkway Hike and Bike Trail Phase 2. The project is located at 1900 Billy G. Webb Drive, within San Patricio County. The estimated cost for this construction effort is $613,283, covering a total area of 16,000 square feet. This works out to a cost of $38 per square foot.

LJA Engineering, Inc. serves as the design firm of record for this project. Carlos Armando Martinez is the registered accessibility specialist associated with the filing. The project was registered with TDLR in June 2026. Plan review is pending, and the construction start date is scheduled for January 2027. The completion date is targeted for July 2027. The TDLR status is listed as Project Registered.

Regional Context and Comparison

This project is one of several registered by the City of Portland. The city has five other TDLR-registered projects totaling $30,455,678, including the Fifth and Elm project and the Christ Andrews Boat Ramp. LJA Engineering, Inc. has six other registered projects totaling $6,803,659, including work in South Houston and Georgetown. The estimated cost of $613,283 is above the county median of $250,000 for similar renovation and alteration filings in San Patricio County. The scheduled build window of 181 days is longer than the county median of 105 days. However, the cost per square foot of $38 is below the county median of $70.

Portland is a community in San Patricio County with a population of about 20,152 according to U.S. Census ACS 2023 five-year estimates for ZIP 78374. The median household income in this area is $81,580. There are approximately 8,426 housing units, with a median owner-occupied home value of $225,800. Housing in the area is mostly owner-occupied. The San Patricio County unemployment rate was 5.4 percent in July 2026, higher than a year earlier. This project involves public funds and public land, reflecting a Federally funded roadway project component.

The registration with TDLR ensures that accessibility standards are considered in the design and construction of the new trail. The project aims to improve connectivity and recreational opportunities along Memorial Parkway. The concrete trail will provide a durable surface for hikers and cyclists. The location on the grassed median suggests an effort to separate trail traffic from vehicle traffic where possible. The involvement of a registered accessibility specialist indicates compliance with state requirements for accessible public spaces. The pending plan review is a standard part of the construction permitting process.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78374 (Portland)

One email per change. Unsubscribe in one click. Privacy.

Memorial Parkway Hike and Bike Trail Phase 2 is a Renovation/Alteration project located at 1900 Billy G. Webb Drive, Portland, TX 78374 in Portland, Texas. The project has an estimated value of $613K covering 16,000 sq ft. City of Portland is the property owner and LJA Engineering, Inc is the design firm of record. The project was registered with TDLR on June 24, 2026.

Frequently Asked Questions

What is the estimated cost of the Portland bike trail project?

The estimated cost for the City of Portland Public ROW project is $613,283. This figure covers the installation of approximately 1,600 linear feet of concrete trail along the Memorial Parkway median.

When is the Portland hike and bike trail expected to be completed?

The project is targeted for July 2027. Construction is scheduled to begin in January 2027, following the registration with TDLR in June 2026.

Who is the design firm for the Memorial Parkway trail?

LJA Engineering, Inc. is the design firm of record. Carlos Armando Martinez is the registered accessibility specialist listed in the TDLR filing for this project.

Is the Portland bike trail project in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer.

What is the scope of work for this project?

The scope involves installing approximately 1,600 linear feet of a 10-foot-wide concrete Hike and Bike Trail along the Memorial Parkway grassed median. The total area is 16,000 square feet.

What is Memorial Parkway Hike and Bike Trail Phase 2?

Memorial Parkway Hike and Bike Trail Phase 2 is a renovation/alteration project at 1900 Billy G. Webb Drive in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing approximately 1,600 linear feet of 10-ft. wide concrete Hike and Bike Trail along the Memorial Parkway grassed median

Is Memorial Parkway Hike and Bike Trail Phase 2 open in Portland?

Memorial Parkway Hike and Bike Trail Phase 2 is still under construction in Portland, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is Memorial Parkway Hike and Bike Trail Phase 2 located?

Memorial Parkway Hike and Bike Trail Phase 2 is located at 1900 Billy G. Webb Drive, Portland, TX, 78374, in San Patricio County.

Who is the owner or developer of Memorial Parkway Hike and Bike Trail Phase 2?

City of Portland is the property owner/developer of record for Memorial Parkway Hike and Bike Trail Phase 2, per its TDLR project registration.

Who is the architect or design firm for Memorial Parkway Hike and Bike Trail Phase 2?

LJA Engineering, Inc is the design firm of record for Memorial Parkway Hike and Bike Trail Phase 2, according to its TDLR filing.

How much does Memorial Parkway Hike and Bike Trail Phase 2 cost and how big is it?

Memorial Parkway Hike and Bike Trail Phase 2 has an estimated construction value of $613K and approximately 16,000 square feet (about $38/sqft), based on its TDLR filing.

Scope of Work

Installing approximately 1,600 linear feet of 10-ft. wide concrete Hike and Bike Trail along the Memorial Parkway grassed median

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1900 Billy G. Webb Drive, Portland, TX, 78374

Loading location map…
27.89229, -97.31499

Watch all construction in 78374 (Portland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Portland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.