Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction)
1900 Billy G. Webb Dr., Portland, TX, 78374
Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) is a renovation/alteration project at 1900 Billy G. Webb Dr., Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.0M across about 20 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 20 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $50.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
96 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
820 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78374 (Portland)
One email per change. Unsubscribe in one click. Privacy.
Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) is a Renovation/Alteration project located at 1900 Billy G. Webb Dr., Portland, TX 78374 in Portland, Texas. The project has an estimated value of $1.0M covering 20 sq ft. City of Portland is the property owner. The project was registered with TDLR on January 12, 2022.
Frequently Asked Questions
What is Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction)?
Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) is a renovation/alteration project at 1900 Billy G. Webb Dr. in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Work consists of including ADA ramps, parking lot improvements, sidewalk expansions and pavement repairs throughout various portions of twenty-two (22) streets in the City of Portland
Is Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) open in Portland?
Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) was scheduled to finish construction in Jul 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) located?
Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) is located at 1900 Billy G. Webb Dr., Portland, TX, 78374, in San Patricio County.
Who is the owner or developer of Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction)?
City of Portland is the property owner/developer of record for Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction), per its TDLR project registration.
How much does Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) cost and how big is it?
Phase 11 Paving Improvements (Part 2 Overlays & Reconstruction) has an estimated construction value of $1.0M and approximately 20 square feet (about $50.00K/sqft), based on its TDLR filing.
Scope of Work
Work consists of including ADA ramps, parking lot improvements, sidewalk expansions and pavement repairs throughout various portions of twenty-two (22) streets in the City of Portland
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1900 Billy G. Webb Dr., Portland, TX 78374
Related Projects
Nearby Projects
Within 1 kmWatch all construction in 78374 (Portland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.