Project intelligenceTDLR TABS2025024276Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Vance Street Capital Expansion in Dallas, TX

8235 Douglas Avenue Suite 1325, Dallas, TX, 75225

Construction complete · Oct 2026Inspection Complete

Vance Street Capital Expansion is a renovation/alteration project at 8235 Douglas Avenue Suite 1325, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $103K across about 816 sq ft.

Estimated project value
$103K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
816 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$126/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 24, 2025446 days across supplied datesOct 13, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    130 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    79 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    227 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Vance Street Capital Expansion

The interior renovation of Suite 1325 at 8235 Douglas Avenue in Dallas is complete. This project, filed under the name Vance Street Capital Expansion, involved an 816 sq ft alteration of existing office space within a high-rise building. The work was privately funded on private land for private use and is now finished, with the building passing its final TDLR accessibility inspection in October 2026.

Project Scope and Cost

Granite, the owner of record, contracted Go Studio as the design firm for this renovation. The estimated cost of the project was $103,000, which translates to $126 per square foot. This cost per square foot is above the county median of $72 for similar renovation and alteration filings in Dallas County, while the total estimated cost sits below the county median of $249,644. The scheduled build window was 89 days, close to the county median of 92 days for this type of work.

The project timeline began with registration in July 2025. Plan review was completed in February 2026, and construction started in December 2025. The filing indicated a completion date of February 2026, but the final inspection was not passed until October 2026. Jeffery L Kelley served as the registered accessibility specialist for the project.

Owner and Design Firm History

Granite has five other TDLR-registered projects totaling $617,820, including three other renovations at The Douglas in Dallas and projects at Lee Parkway in Dallas and 2 Eldridge Place in Houston. All of these other projects are closed. Go Studio, the design firm, has six other TDLR-registered projects totaling $4,192,000 across Dallas, Plano, and Austin. These include projects at Old Parkland - Reagan Place, Willow Bend Office Center I, Las Cimas III, Toll Hill East, and 10000 NCX.

The project is located in ZIP code 75225, which has a population of about 22,383 and a median household income of $189,985 according to U.S. Census ACS 2023 five-year estimates. The area has 9,839 housing units with a median owner-occupied home value of $1,489,200, and housing is predominantly owner-occupied. The Dallas County unemployment rate was 3.3 percent in July 2026, higher than a year earlier.

With the final TDLR accessibility inspection passed in October 2026, the construction phase of this 816 sq ft office renovation at 8235 Douglas Avenue is complete. The project reflects a standard interior alteration within a larger building, managed by Granite and designed by Go Studio, and is now recorded as Inspection Complete by TDLR.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75225 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Vance Street Capital Expansion is a Renovation/Alteration project located at 8235 Douglas Avenue Suite 1325, Dallas, TX 75225 in Dallas, Texas. The project has an estimated value of $103K covering 816 sq ft. Granite is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on July 24, 2025.

Frequently Asked Questions

What is the status of the renovation at 8235 Douglas Avenue?

The renovation is complete. The project passed its final TDLR accessibility inspection in October 2026, and the TDLR status is listed as Inspection Complete.

Who is the owner and design firm for this project?

Granite is the owner of record, and Go Studio is the design firm of record for the Vance Street Capital Expansion project.

How much did the renovation cost?

The estimated cost of the 816 sq ft renovation was $103,000, which is $126 per square foot.

Is the business at Suite 1325 open?

The TDLR record confirms construction is complete and the final inspection was passed in October 2026, but it does not provide information on whether the business is open to the public.

When did construction start and finish?

Construction started in December 2025. The filing listed a completion date of February 2026, but the final inspection was passed in October 2026.

What is Vance Street Capital Expansion?

Vance Street Capital Expansion is a renovation/alteration project at 8235 Douglas Avenue Suite 1325 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in high rise building

Is Vance Street Capital Expansion open in Dallas?

Construction on Vance Street Capital Expansion is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Vance Street Capital Expansion located?

Vance Street Capital Expansion is located at 8235 Douglas Avenue Suite 1325, Dallas, TX, 75225, in Dallas County.

Who is the owner or developer of Vance Street Capital Expansion?

Granite is the property owner/developer of record for Vance Street Capital Expansion, per its TDLR project registration.

Who is the architect or design firm for Vance Street Capital Expansion?

Go Studio is the design firm of record for Vance Street Capital Expansion, according to its TDLR filing.

How much does Vance Street Capital Expansion cost and how big is it?

Vance Street Capital Expansion has an estimated construction value of $103K and approximately 816 square feet (about $126/sqft), based on its TDLR filing.

Scope of Work

Interior renovation of existing office space in high rise building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8235 Douglas Avenue Suite 1325, Dallas, TX, 75225

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75225 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.