Project intelligenceTDLR TABS2025025052New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Celina Fire Station #4

1205 Punk Carter Pkwy, Celina, TX, 75009

Target date passed (Nov 2026)Review Complete

Celina Fire Station #4 is a new construction project at 1205 Punk Carter Pkwy, Celina, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $11.5M across about 13,375 sq ft.

Estimated project value
$11.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,375 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$860/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 4, 2025455 days across supplied datesNov 2, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    72 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    383 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Celina Fire Station #4

Celina Fire Station #4 is a new construction project located at 1205 Punk Carter Pkwy, Celina, TX 75009. The City of Celina owns the property, and Conduit A+D serves as the design firm of record. The project covers 13,375 sq ft and includes a storm shelter. Registered accessibility specialist Jeffery L Kelley filed the registration in August 2025.

Project Scope and Cost

The facility is designed to support 11 fire personnel and includes necessary support spaces. The estimated cost for this work is $11,500,000, which results in a cost per sq ft of $860. This project involves public funds and public land. The TDLR status shows that plan review was completed in August 2025.

Timeline and Status

TDLR completed plan review in August 2025 and construction is scheduled to finish in November 2026, with work starting October 2025. The project is not yet complete, and the construction phase is the primary focus of the current record.

Collin County median estimated cost for new construction is $800,000, with a median size of 7,092 sq ft. This project's cost is above the county median for its type. The scheduled build window of 383 days is longer than the county median of 212 days. Its $860 per sq ft is above the county median of $121.

Other registered projects in the same area include The Crossing at Moore Farm and Methodist Celina Medical Center. The City of Celina has 6 other TDLR-registered projects totaling $79,718,000. Conduit A+D has 6 other TDLR-registered projects totaling $8,631,000. Collin County unemployment rate (FRED, September 2026): 4.1 percent, lower than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75009 (Celina)

One email per change. Unsubscribe in one click. Privacy.

Celina Fire Station #4 is a New Construction project located at 1205 Punk Carter Pkwy, Celina, TX 75009 in Celina, Texas. The project has an estimated value of $11.5M covering 13,375 sq ft. City of Celina is the property owner and Conduit A+D is the design firm of record. The project was registered with TDLR on August 4, 2025.

Frequently Asked Questions

What is the address of Celina Fire Station #4?

The address is 1205 Punk Carter Pkwy, Celina, TX 75009. This location is in Collin County and serves the City of Celina.

Who is the registered accessibility specialist for this project?

Jeffery L Kelley is the registered accessibility specialist for this project. The registration occurred in August 2025.

What is the total square footage of the new station?

The total square footage is 13,375 sq ft. The estimated cost is $11,500,000, resulting in $860 per sq ft.

When does construction start?

Construction is scheduled to start in October 2025. Plan review was completed in August 2025.

Is the fire station open for service?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is scheduled to finish in November 2026.

What is Celina Fire Station #4?

Celina Fire Station #4 is a new construction project at 1205 Punk Carter Pkwy in Celina, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 3 bay fire station with capacity for 11 fire personnel and support spaces, including storm shelter

Is Celina Fire Station #4 open in Celina?

Celina Fire Station #4 was scheduled to finish construction in Nov 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Celina Fire Station #4 located?

Celina Fire Station #4 is located at 1205 Punk Carter Pkwy, Celina, TX, 75009, in Collin County.

Who is the owner or developer of Celina Fire Station #4?

City of Celina is the property owner/developer of record for Celina Fire Station #4, per its TDLR project registration.

Who is the architect or design firm for Celina Fire Station #4?

Conduit A+D is the design firm of record for Celina Fire Station #4, according to its TDLR filing.

How much does Celina Fire Station #4 cost and how big is it?

Celina Fire Station #4 has an estimated construction value of $11.5M and approximately 13,375 square feet (about $860/sqft), based on its TDLR filing.

Scope of Work

New 3 bay fire station with capacity for 11 fire personnel and support spaces, including storm shelter

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1205 Punk Carter Pkwy, Celina, TX, 75009

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75009 (Celina)