Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Palmer Elementary School Kitchen Renovation in Missouri City, TX
4208 Crow Valley Dr, Missouri City, TX, 77459
Palmer Elementary School Kitchen Renovation is a renovation/alteration project at 4208 Crow Valley Dr, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $2.1M across about 2,122 sq ft.
- Estimated project value
- $2.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,122 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $994/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
354 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
331 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Palmer Elementary School Kitchen Renovation
Fort Bend Independent School District is undertaking a complete kitchen renovation at Palmer Elementary School in Missouri City. The project, filed as the Palmer Elementary School Kitchen Renovation, covers 2,122 sq ft of space at 4208 Crow Valley Dr. The estimated cost for this renovation and alteration work is $2,110,040.
MWA Architects, Inc. serves as the design firm of record for the project. The scope includes the replacement of ceilings, flooring, plumbing, and mechanical systems. This work is part of a broader portfolio of infrastructure improvements managed by the district, which has six other TDLR-registered projects totaling $42,128,000 in estimated costs.
Project Timeline and Status
The project was registered with TDLR in August 2025, and plan review was completed in the same month. Construction is scheduled to begin in August 2026. The filing indicates the project is scheduled to finish in June 2027. This timeline results in a scheduled build window of 331 days, which is longer than the county median of 92 days for similar renovation and alteration filings in Fort Bend County.
The estimated cost of $2,110,040 places this project in the top quarter of costs for its type in the county. The median estimated cost for renovation and alteration projects in Fort Bend County is $239,500. The cost per square foot for this project is $994, which is above the county median of $80 per square foot. These figures reflect the specialized nature of the work involved in updating a school kitchen environment.
The site is located in ZIP code 77459, a predominantly owner-occupied area with a median household income of $132,758 according to U.S. Census ACS 2023 five-year estimates. The median owner-occupied home value in this ZIP code is $367,700. Nearby businesses include Sleiman Sandbox and En'terior Designs, a general contractor. The project involves public funds and is registered on public land.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77459 (Missouri City)
One email per change. Unsubscribe in one click. Privacy.
Palmer Elementary School Kitchen Renovation is a Renovation/Alteration project located at 4208 Crow Valley Dr,, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $2.1M covering 2,122 sq ft. Fort Bend Independent School District is the property owner and MWA Architects, Inc. is the design firm of record. The project was registered with TDLR on August 14, 2025.
Frequently Asked Questions
When will the Palmer Elementary School kitchen renovation be completed?
The project is scheduled to finish in June 2027, with construction starting in August 2026.
Who is the owner of the Palmer Elementary School kitchen renovation project?
Fort Bend Independent School District is the owner of record for this project.
Is the Palmer Elementary School kitchen renovation currently open to the public?
The project is under construction status with plan review complete. It is not described as open or operating.
Who designed the Palmer Elementary School kitchen renovation?
MWA Architects, Inc. is the design firm of record for the project.
What is Palmer Elementary School Kitchen Renovation?
Palmer Elementary School Kitchen Renovation is a renovation/alteration project at 4208 Crow Valley Dr in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Complete kitchen renovation including ceilings, flooring, plumbing, mechanical replacement.
Is Palmer Elementary School Kitchen Renovation open in Missouri City?
Palmer Elementary School Kitchen Renovation is still under construction in Missouri City, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is Palmer Elementary School Kitchen Renovation located?
Palmer Elementary School Kitchen Renovation is located at 4208 Crow Valley Dr, Missouri City, TX, 77459, in Fort Bend County.
Who is the owner or developer of Palmer Elementary School Kitchen Renovation?
Fort Bend Independent School District is the property owner/developer of record for Palmer Elementary School Kitchen Renovation, per its TDLR project registration.
Who is the architect or design firm for Palmer Elementary School Kitchen Renovation?
MWA Architects, Inc. is the design firm of record for Palmer Elementary School Kitchen Renovation, according to its TDLR filing.
How much does Palmer Elementary School Kitchen Renovation cost and how big is it?
Palmer Elementary School Kitchen Renovation has an estimated construction value of $2.1M and approximately 2,122 square feet (about $994/sqft), based on its TDLR filing.
Scope of Work
Complete kitchen renovation including ceilings, flooring, plumbing, mechanical replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4208 Crow Valley Dr, Missouri City, TX, 77459
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$47.53B totalWatch all construction in 77459 (Missouri City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Missouri City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.