M1 Mission First
M1 Mission First is a renovation/alteration project at 1500 Solana Blvd., Suite 5200, Westlake, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.3M across about 20,782 sq ft.
๐Project Metrics
TDLR #TABS2025026439Review Complete
Design review complete, construction may proceed
M1 Mission First is a Renovation/Alteration project located at 1500 Solana Blvd., Suite 5200, Westlake, TX 76262 in Westlake, Texas. The project has an estimated value of $2.3M covering 20,782 sq ft. Sol Westlake, LP is the property owner and BHA Studio is the design firm of record. The project was registered with TDLR on August 21, 2025.
โFrequently Asked Questions
What is M1 Mission First?
M1 Mission First is a renovation/alteration project at 1500 Solana Blvd., Suite 5200 in Westlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing interior commercial office space
Is M1 Mission First open in Westlake?
M1 Mission First is currently under construction in Westlake, TX. Its current TDLR status is "Review Complete".
Where is M1 Mission First located?
M1 Mission First is located at 1500 Solana Blvd., Suite 5200, Westlake, TX, 76262, in Denton County.
Who is the owner or developer of M1 Mission First?
Sol Westlake, LP is the property owner/developer of record for M1 Mission First, per its TDLR project registration.
Who is the architect or design firm for M1 Mission First?
BHA Studio is the design firm of record for M1 Mission First, according to its TDLR filing.
How much does M1 Mission First cost and how big is it?
M1 Mission First has an estimated construction value of $2.3M and approximately 20,782 square feet (about $108/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing interior commercial office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 21, 2025
Review Complete
Aug 21, 2025
Inspection Complete
Closed