Waco Downtown Redevelopment Infrastructure, Phase 1A
4th St, 3rd St, Jefferson Ave, University Parks Dr Columbus Ave., Washington Ave., Waco, TX, 76701
Waco Downtown Redevelopment Infrastructure, Phase 1A is a renovation/alteration project at 4th St, 3rd St, Jefferson Ave, University Parks Dr Columbus Ave., Washington Ave., Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2028. The project has an estimated value of $75.0M across about 1,300,000 sq ft.
- Estimated project value
- $75.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,300,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $58/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
220 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
915 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Waco Downtown Redevelopment Infrastructure, Phase 1A
The Waco Downtown Redevelopment Infrastructure, Phase 1A, is a $75,000,000 renovation and alteration project spanning 1,300,000 square feet across six major downtown streets in Waco, Texas. This large-scale municipal effort involves the reconstruction of existing streets and the construction of extensive streetscaping elements, including sidewalks, curb ramps, hardscape, lighting, and landscaping. The scope also includes the installation of large box culverts, storm drain systems, and both public and private utilities.
Located in McLennan County, the project covers 4th St., 3rd St., Jefferson Ave., University Parks Dr., Columbus Ave., and Washington Ave. in the 76701 ZIP code area. The City of Waco is the owner and developer of record for this infrastructure upgrade. Walker Partners serves as the design firm of record, overseeing the planning and design aspects of this complex urban renewal initiative.
Project Timeline and Status
The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2025. TDLR completed the plan review process in April 2026. Construction is scheduled to begin in May 2026 and is scheduled to finish in November 2028. This timeline represents a significant build window, reflecting the magnitude of the utility and street reconstruction work involved in the downtown core.
The estimated cost of $75,000,000 places this project in the top quarter of renovation and alteration filings in McLennan County over the last 24 months, where the median estimated cost is $278,572. While the project’s cost is above the county median, the computed cost per square foot is $58, which is below the county median of $96 per square foot. The scheduled build window of 915 days is longer than the county median of 122 days, consistent with the extensive nature of the infrastructure work.
The City of Waco has six other TDLR-registered projects totaling $23,472,170, including the Waco Right of Way project and the Dr. Mae Jackson Development Center. Walker Partners has been the design firm for six other TDLR-registered projects totaling $4,842,439, including The Parke in Cedar Park and the Chapel Road project in Waco. This project is a significant component of the city's ongoing infrastructure investment strategy in the downtown area.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76701 (Waco)
One email per change. Unsubscribe in one click. Privacy.
Waco Downtown Redevelopment Infrastructure, Phase 1A is a Renovation/Alteration project located at 4th St, 3rd St, Jefferson Ave, University Parks Dr Columbus Ave., Washington Ave., Waco, TX 76701 in Waco, Texas. The project has an estimated value of $75.0M covering 1,300,000 sq ft. City of Waco is the property owner and Walker Partners is the design firm of record. The project was registered with TDLR on August 26, 2025.
Frequently Asked Questions
When is the Waco Downtown Redevelopment Phase 1A scheduled to finish?
Construction is scheduled to finish in November 2028. The project is registered with TDLR, and plan review was completed in April 2026, with construction starting in May 2026.
What is the estimated cost of this street reconstruction project?
The estimated cost is $75,000,000. This figure is above the median estimated cost for renovation and alteration projects in McLennan County, which is $278,572.
Who is the design firm for the Waco Downtown Redevelopment?
Walker Partners is the design firm of record. They are responsible for the design of this 1,300,000 square foot infrastructure project in Waco.
What specific work is included in the scope of Phase 1A?
The scope includes reconstruction of existing streets, construction of sidewalks, curb ramps, hardscape, lighting, and landscaping. It also involves large box culverts, storm drains, and public and private utilities.
Is the Waco Downtown Redevelopment project currently open to the public?
The project is in the construction phase, with work starting in May 2026. It is not a commercial business opening, but rather a public infrastructure improvement. The TDLR status is Review Complete.
What is Waco Downtown Redevelopment Infrastructure, Phase 1A?
Waco Downtown Redevelopment Infrastructure, Phase 1A is a renovation/alteration project at 4th St, 3rd St, Jefferson Ave, University Parks Dr Columbus Ave., Washington Ave. in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of existing streets and construction of streetscaping elements (sidewalk, curb ramps, hardscape, lighting, and landscaping). Construction of large box culverts, storm drain systems, public utilities, and private utilities.…
Is Waco Downtown Redevelopment Infrastructure, Phase 1A open in Waco?
Waco Downtown Redevelopment Infrastructure, Phase 1A is still under construction in Waco, TX, with an estimated completion of Nov 2028 according to its TDLR registration.
Where is Waco Downtown Redevelopment Infrastructure, Phase 1A located?
Waco Downtown Redevelopment Infrastructure, Phase 1A is located at 4th St, 3rd St, Jefferson Ave, University Parks Dr Columbus Ave., Washington Ave., Waco, TX, 76701, in McLennan County.
Who is the owner or developer of Waco Downtown Redevelopment Infrastructure, Phase 1A?
City of Waco is the property owner/developer of record for Waco Downtown Redevelopment Infrastructure, Phase 1A, per its TDLR project registration.
Who is the architect or design firm for Waco Downtown Redevelopment Infrastructure, Phase 1A?
Walker Partners is the design firm of record for Waco Downtown Redevelopment Infrastructure, Phase 1A, according to its TDLR filing.
How much does Waco Downtown Redevelopment Infrastructure, Phase 1A cost and how big is it?
Waco Downtown Redevelopment Infrastructure, Phase 1A has an estimated construction value of $75.0M and approximately 1,300,000 square feet (about $58/sqft), based on its TDLR filing.
Scope of Work
Reconstruction of existing streets and construction of streetscaping elements (sidewalk, curb ramps, hardscape, lighting, and landscaping). Construction of large box culverts, storm drain systems, public utilities, and private utilities.1,300,000 sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4th St, 3rd St, Jefferson Ave, University Parks Dr Columbus Ave., Washington Ave., Waco, TX, 76701
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$394.3M totalWatch all construction in 76701 (Waco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Waco?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.