Mutabak Karak is a renovation/alteration project at 1057 S Sherman Street, Ste. 110, Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $250K across about 2,210 sq ft.
Final inspection completed, awaiting project closure
Mutabak Karak is a Renovation/Alteration project located at 1057 S Sherman Street, Ste. 110, Richardson, TX 75081 in Richardson, Texas. The project has an estimated value of $250K covering 2,210 sq ft. CAMPFIRE SHOPS LLC is the property owner and Nour Architecture and Design, LLC is the design firm of record. The project was registered with TDLR on August 28, 2025.
Mutabak Karak is a renovation/alteration project at 1057 S Sherman Street, Ste. 110 in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior fit-out work within existing multi-use structure for a small restaurant business tenant. Scope space is currently in a dark shell condition.
Construction on Mutabak Karak is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Mutabak Karak is located at 1057 S Sherman Street, Ste. 110, Richardson, TX, 75081, in Dallas County.
CAMPFIRE SHOPS LLC is the property owner/developer of record for Mutabak Karak, per its TDLR project registration.
Nour Architecture and Design, LLC is the design firm of record for Mutabak Karak, according to its TDLR filing.
Mutabak Karak has an estimated construction value of $250K and approximately 2,210 square feet (about $113/sqft), based on its TDLR filing.
Interior fit-out work within existing multi-use structure for a small restaurant business tenant. Scope space is currently in a dark shell condition.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 28, 2025
Review Complete
Aug 28, 2025
Inspection Complete
Apr 23, 2026
Closed
238d
Construction phase