Garland 2025 Emberwood & Sugarberry-City of is a renovation/alteration project at 530 Tower Street, Garland, TX 75040, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $3.3M across about 1,850 sq ft.
Design review complete, construction may proceed
Garland 2025 Emberwood & Sugarberry-City of is a Renovation/Alteration project located at 530 Tower Street, Garland, TX 75040, Garland, TX 75040 in Garland, Texas. The project has an estimated value of $3.3M covering 1,850 sq ft. City of Garland, TX is the property owner and Lockwood, Andrews and Newnam, Inc. is the design firm of record. The project was registered with TDLR on September 16, 2025.
Garland 2025 Emberwood & Sugarberry-City of is a renovation/alteration project at 530 Tower Street, Garland, TX 75040 in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of 1850 LF of existing residential street, Replacement of approximately 1,820 of existing water line, and Replacement of approximately 2,150 LF of existing wastewater line at Emberwood Dr. and Sugarberry Ln.
Garland 2025 Emberwood & Sugarberry-City of is still under construction in Garland, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Garland 2025 Emberwood & Sugarberry-City of is located at 530 Tower Street, Garland, TX 75040, Garland, TX, 75040, in Dallas County.
City of Garland, TX is the property owner/developer of record for Garland 2025 Emberwood & Sugarberry-City of, per its TDLR project registration.
Lockwood, Andrews and Newnam, Inc. is the design firm of record for Garland 2025 Emberwood & Sugarberry-City of, according to its TDLR filing.
Garland 2025 Emberwood & Sugarberry-City of has an estimated construction value of $3.3M and approximately 1,850 square feet (about $1.79K/sqft), based on its TDLR filing.
Reconstruction of 1850 LF of existing residential street, Replacement of approximately 1,820 of existing water line, and Replacement of approximately 2,150 LF of existing wastewater line at Emberwood Dr. and Sugarberry Ln.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 16, 2025
Review Complete
Sep 16, 2025
Inspection Complete
Closed