Project intelligenceTDLR TABS2027002724New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

North Cowan Avenue: Phase 1 in Lewisville, TX

North Cowan Ave from E. Jones St to the Cul-de-sac, Lewisville, TX, 75057

Opening ~Feb 2028Project Registered

North Cowan Avenue: Phase 1 is a new construction project at North Cowan Ave from E. Jones St to the Cul-de-sac, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $7.1M across about 66,000 sq ft.

Estimated project value
$7.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
66,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$107/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 5, 2026512 days across supplied datesFeb 29, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    300 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About North Cowan Avenue: Phase 1

The City of Lewisville is moving forward with the new construction of North Cowan Avenue, a roadway project spanning from East Jones Street to the local cul-de-sac. This 66,000 sq ft development includes new pavement, sidewalks, and essential utility infrastructure. The total estimated cost for this phase is $7,055,609, with construction scheduled to begin in August 2027. The project is registered with TDLR and completion is targeted for February 2028.

Project Scope and Design

Lockwood, Andrews and Newnam, Inc. serves as the design firm of record for this municipal improvement. The scope covers the full construction of the street segment, ensuring that both surface infrastructure and underground utilities are installed to code. Marcela Abadi Rhoads is the registered accessibility specialist associated with the filing. The work is classified as new construction, distinct from simple repairs or maintenance, and involves significant civil works within Denton County.

The project utilizes public funds and involves public land, marking it as a Federally funded roadway project. This classification places it within a specific regulatory framework for public works. The estimated cost of $7,055,609 is above the county median for similar new construction filings in Denton County. When compared to the 4524 registered new construction projects in the area, this cost sits in the top quarter of the range.

Timeline and Market Context

The scheduled build window for North Cowan Avenue is approximately 212 days, from the August 2027 start to the February 2028 completion. This duration is close to the county median of 220 days for similar projects. The cost per square foot is calculated at $107, which is close to the county median of $121 per square foot. These figures suggest a standard pricing structure for municipal roadway work in the region.

The City of Lewisville has six other TDLR-registered projects on record, totaling $14,333,952. These include the Lewisville Animal Shelter, the City Hall Annex, and the Summit Avenue Streetscape Improvements. All of these other projects have completed their review phases. The design firm, Lockwood, Andrews and Newnam, Inc., has worked on six other registered projects across Texas, including work in Garland, Plano, and San Antonio. Their portfolio demonstrates experience with various municipal clients and project scales.

Residents in the 75057 ZIP code, which has a population of about 16,836, will see the direct benefits of this infrastructure upgrade. The area has a median household income of $76,128 and a median owner-occupied home value of $208,500. The new roadway will improve access and connectivity within this neighborhood. The project registration status is active, with plan review pending following the October 2026 filing date. Construction has not yet started, and the site remains in the pre-construction phase.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75057 (Lewisville)

One email per change. Unsubscribe in one click. Privacy.

North Cowan Avenue: Phase 1 is a New Construction project located at North Cowan Ave from E. Jones St to the Cul-de-sac, Lewisville, TX 75057 in Lewisville, Texas. The project has an estimated value of $7.1M covering 66,000 sq ft. City of Lewisville is the property owner and Lockwood, Andrews and Newnam, Inc. is the design firm of record. The project was registered with TDLR on October 5, 2026.

Frequently Asked Questions

When does construction start?

Construction is scheduled to begin in August 2027 according to the project filing. The start date is part of the official timeline registered with the state.

Who is the design firm?

Lockwood, Andrews and Newnam, Inc. is the design firm of record. They are responsible for the engineering and design aspects of the roadway project.

What is the total cost?

The estimated cost for the project is $7,055,609. This figure includes pavement, sidewalks, and utilities for the 66,000 sq ft area.

Is the project finished?

No, the project is in the registration and planning phase. Construction has not started yet, and completion is targeted for February 2028.

Who owns the project?

The City of Lewisville is the owner and developer of record. It is a public project involving public funds and land.

What is North Cowan Avenue: Phase 1?

North Cowan Avenue: Phase 1 is a new construction project at North Cowan Ave from E. Jones St to the Cul-de-sac in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of N. Cowan Ave, including pavement, sidewalks, and utilities. 66,000 sqft

Is North Cowan Avenue: Phase 1 open in Lewisville?

North Cowan Avenue: Phase 1 is still under construction in Lewisville, TX, with an estimated completion of Feb 2028 according to its TDLR registration.

Where is North Cowan Avenue: Phase 1 located?

North Cowan Avenue: Phase 1 is located at North Cowan Ave from E. Jones St to the Cul-de-sac, Lewisville, TX, 75057, in Denton County.

Who is the owner or developer of North Cowan Avenue: Phase 1?

City of Lewisville is the property owner/developer of record for North Cowan Avenue: Phase 1, per its TDLR project registration.

Who is the architect or design firm for North Cowan Avenue: Phase 1?

Lockwood, Andrews and Newnam, Inc. is the design firm of record for North Cowan Avenue: Phase 1, according to its TDLR filing.

How much does North Cowan Avenue: Phase 1 cost and how big is it?

North Cowan Avenue: Phase 1 has an estimated construction value of $7.1M and approximately 66,000 square feet (about $107/sqft), based on its TDLR filing.

Scope of Work

Construction of N. Cowan Ave, including pavement, sidewalks, and utilities. 66,000 sqft

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

North Cowan Ave from E. Jones St to the Cul-de-sac, Lewisville, TX, 75057

33.05516, -97.00135

Watch all construction in 75057 (Lewisville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Lewisville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.