Qamaria Coffee is a renovation/alteration project at 4980 Broadway Drive, Ste 2, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $150K across about 2,500 sq ft.
Final inspection completed, awaiting project closure
Qamaria Coffee is a Renovation/Alteration project located at 4980 Broadway Drive, Ste 2, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $150K covering 2,500 sq ft. AG PLANO RE HOLDINGS LLC is the property owner and Nour Architecture and Design, LLC is the design firm of record. The project was registered with TDLR on September 22, 2025.
Qamaria Coffee is a renovation/alteration project at 4980 Broadway Drive, Ste 2 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build-out within an existing retail strip structure for the use of a coffee shop business.
Construction on Qamaria Coffee is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Qamaria Coffee is located at 4980 Broadway Drive, Ste 2, Plano, TX, 75024, in Collin County.
AG PLANO RE HOLDINGS LLC is the property owner/developer of record for Qamaria Coffee, per its TDLR project registration.
Nour Architecture and Design, LLC is the design firm of record for Qamaria Coffee, according to its TDLR filing.
Qamaria Coffee has an estimated construction value of $150K and approximately 2,500 square feet (about $60/sqft), based on its TDLR filing.
Interior build-out within an existing retail strip structure for the use of a coffee shop business.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 22, 2025
Review Complete
Sep 22, 2025
Inspection Complete
Jun 20, 2026
Closed
271d
Construction phase