Funding type
This project is privately funded, on private land for private use.
Valvoline in Midland, TX
6401 HWY 158, Midland, TX, 02038
Valvoline is a new construction project at 6401 HWY 158, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $1.4M across about 3,447 sq ft.
- Estimated project value
- $1.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,447 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $420/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
73 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
144 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Valvoline
A 3,447 sq ft Valvoline Instant Oil Change facility at 6401 HWY 158 in Midland has passed its final TDLR accessibility inspection, confirming the new construction project is complete. The building owner, CG 191 & 158 LLC, filed for TDLR registration in September 2025, with construction beginning in December 2025 and finishing in June 2026. The project received its final inspection in October 2026, closing out the regulatory requirements for this privately funded commercial site on private land.
Project Scope and Costs
The registered accessibility specialist for this Midland County project was Landy Perkins. The estimated cost for the new construction was $1,449,000, resulting in a cost per square foot of $420. This figure is above the county median of $169 per sq ft for new construction filings in Midland County. The planned build window was 182 days, which is shorter than the county median of 243 days. The design firm of record was HFA-AE, Ltd, a firm with six other TDLR-registered projects totaling $8,694,000 across Texas.
Regional Context
This Valvoline location is part of a broader expansion that includes projects in Richmond, Dripping Springs, and San Antonio, all registered with similar costs. The Midland site sits in an area with a median household income of $142,788 and a median owner-occupied home value of $567,100, according to U.S. Census ACS 2023 estimates for ZIP 02038. Other registered projects in the vicinity include a Bulk Plant, Texas International OIL Tools, Bush's Chicken Restaurant, Flying J, and a Stripes renovation. The Midland County unemployment rate was 3.3 percent in August 2026.
The project represents a significant investment in the local commercial infrastructure, adhering to Texas Accessibility Standards for public accommodations. The completion of the final inspection marks the end of the construction phase, ensuring the facility meets all mandated accessibility requirements for customers and employees.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 02038 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Valvoline is a New Construction project located at 6401 HWY 158, Midland, TX 02038 in Midland, Texas. The project has an estimated value of $1.4M covering 3,447 sq ft. CG 191 & 158 LLC is the property owner and HFA-AE, Ltd is the design firm of record. The project was registered with TDLR on September 26, 2025.
Frequently Asked Questions
Is the Valvoline in Midland open for business?
The TDLR record covers construction only and does not record whether the business has started serving customers. The final TDLR accessibility inspection was completed in October 2026, confirming the building is finished.
Who designed the Valvoline Midland project?
The design firm of record for this project is HFA-AE, Ltd. This firm has registered six other TDLR projects totaling $8,694,000, including other Valvoline locations in Texas.
What is the size of the Valvoline building?
The new construction facility is 3,447 sq ft. The estimated cost was $1,449,000, resulting in a cost per square foot of $420.
When was the TDLR registration filed?
The project was registered with TDLR in September 2025. Construction started in December 2025, with a completion date of June 2026 and final inspection in October 2026.
Who is the accessibility specialist for this site?
Landy Perkins is the registered accessibility specialist for the Valvoline project at 6401 HWY 158 in Midland, Texas.
What is Valvoline?
Valvoline is a new construction project at 6401 HWY 158 in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Construction 3447 sq ft Valvoline Instant Oil Change
Is Valvoline open in Midland?
Construction on Valvoline is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is Valvoline located?
Valvoline is located at 6401 HWY 158, Midland, TX, 02038, in Midland County.
Who is the owner or developer of Valvoline?
CG 191 & 158 LLC is the property owner/developer of record for Valvoline, per its TDLR project registration.
Who is the architect or design firm for Valvoline?
HFA-AE, Ltd is the design firm of record for Valvoline, according to its TDLR filing.
How much does Valvoline cost and how big is it?
Valvoline has an estimated construction value of $1.4M and approximately 3,447 square feet (about $420/sqft), based on its TDLR filing.
Scope of Work
New Construction 3447 sq ft Valvoline Instant Oil Change
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6401 HWY 158, Midland, TX, 02038
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$482.4M totalWatch all construction in 02038 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.