Woodrow Road Phase 2 in Lubbock, TX
Woodrow Road, Lubbock, TX, 79424
Woodrow Road Phase 2 is a new construction project at Woodrow Road, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2028. The project has an estimated value of $28.0M across about 10,530 sq ft.
- Estimated project value
- $28.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,530 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2.66K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
98 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
33 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
827 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Woodrow Road Phase 2
Woodrow Road Phase 2 in Lubbock is a new construction project valued at $28,000,000. The work involves widening the roadway from two lanes to five lanes, with grading, curb and gutter, paving, structures, drainage improvements, signing, and pavement markings. The project is registered with TDLR and is scheduled to finish in May 2028.
Scope and Design
Lubbock County serves as the owner of record for this infrastructure upgrade. Kimley Horn is the design firm of record, overseeing the technical aspects of the build. The filing specifies a scope that includes significant civil engineering elements such as drainage improvements and structural work, ensuring the expanded capacity meets current and future traffic demands. Landy Perkins is the registered accessibility specialist associated with the filing.
The project was registered with TDLR in October 2025. Plan review was completed in February 2026, clearing the path for construction to begin in January 2026. The estimated cost of $28,000,000 places this project in the top quarter of estimated costs for new construction filings in Lubbock County. The scheduled build window of 860 days is longer than the county median of 244 days, reflecting the complexity of the multi-lane expansion and associated infrastructure upgrades.
Local Context and Funding
This project involves public funds and is a Federally funded roadway project. It is located at Woodrow Road, Lubbock, TX 79424, within Lubbock County. The area profile for ZIP 79424 indicates a population of about 52,336 and a median household income of $94,703, according to U.S. Census ACS 2023 five-year estimates. The housing stock in this area is mostly owner-occupied, with a median owner-occupied home value of $279,600.
Third-party records indicate active procurement and planning activities for this specific phase. A post on citizenportal.ai noted that Lubbock County commissioners approved a budget transfer and awarded the contract for Woodrow Road Phase 2 to West Texas Paving Inc. Another mention on projects.constructconnect.com describes the Lubbock County Commissioners Court requesting bids for the material, labor, and construction of Woodrow Road Phase II. These external records align with the TDLR filing status, which shows the project as Review Complete with construction scheduled to start in January 2026.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79424 (Lubbock)
One email per change. Unsubscribe in one click. Privacy.
Woodrow Road Phase 2 is a New Construction project located at Woodrow Road, Lubbock, TX 79424 in Lubbock, Texas. The project has an estimated value of $28.0M covering 10,530 sq ft. Lubbock County is the property owner and Kimley Horn is the design firm of record. The project was registered with TDLR on October 2, 2025.
Frequently Asked Questions
What is the current status of Woodrow Road Phase 2?
TDLR completed plan review in February 2026. Construction is scheduled to start in January 2026 and is scheduled to finish in May 2028. The project status is Review Complete.
Who is building Woodrow Road Phase 2?
Lubbock County is the owner of record. Kimley Horn is the design firm. A third-party record states that West Texas Paving Inc. was awarded the contract for the project.
How much does the Woodrow Road Phase 2 project cost?
The estimated cost is $28,000,000. This figure is above the county median for new construction projects in Lubbock County.
What work is included in Woodrow Road Phase 2?
The scope includes widening two lanes to five lanes, grading, curb and gutter, paving, structures, drainage improvements, signing, and pavement markings.
Is Woodrow Road Phase 2 open to the public?
The TDLR record tracks construction status, not business operations. The project is under construction, with work starting in January 2026 and scheduled to finish in May 2028.
What is Woodrow Road Phase 2?
Woodrow Road Phase 2 is a new construction project at Woodrow Road in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen two lanes to five lanes, grading, curb and gutter, paving, structures, drainage improvements, signing and pavement markings.
Is Woodrow Road Phase 2 open in Lubbock?
Woodrow Road Phase 2 is still under construction in Lubbock, TX, with an estimated completion of May 2028 according to its TDLR registration.
Where is Woodrow Road Phase 2 located?
Woodrow Road Phase 2 is located at Woodrow Road, Lubbock, TX, 79424, in Lubbock County.
Who is the owner or developer of Woodrow Road Phase 2?
Lubbock County is the property owner/developer of record for Woodrow Road Phase 2, per its TDLR project registration.
Who is the architect or design firm for Woodrow Road Phase 2?
Kimley Horn is the design firm of record for Woodrow Road Phase 2, according to its TDLR filing.
How much does Woodrow Road Phase 2 cost and how big is it?
Woodrow Road Phase 2 has an estimated construction value of $28.0M and approximately 10,530 square feet (about $2.66K/sqft), based on its TDLR filing.
Scope of Work
Widen two lanes to five lanes, grading, curb and gutter, paving, structures, drainage improvements, signing and pavement markings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Woodrow Road, Lubbock, TX, 79424
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$242.7M totalWatch all construction in 79424 (Lubbock)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lubbock?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.