City of Conroe Fire Station 8
676 FM 3083, Conroe, TX, 77301
City of Conroe Fire Station 8 is a new construction project at 676 FM 3083, Conroe, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.1M across about 10,224 sq ft.
- Estimated project value
- $3.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,224 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $308/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
55 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source record
📰About City of Conroe Fire Station 8
The City of Conroe Fire Station 8 is a new construction project located at 676 FM 3083 in Conroe, Montgomery County. The facility covers 10,224 sq ft and includes three apparatus bays and living quarters. The estimated cost is $3,150,000. TDLR completed plan review in October 2025, and construction was scheduled to finish in June 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
Design and Scope
SLI Group serves as the design firm of record for the City of Conroe Fire Station 8. The registered accessibility specialist is Janel Carona Bloom. The project involves public funds and public land. The scope is a ground-up fire station designed for operational apparatus storage and personnel housing.
The 10,224 sq ft footprint is slightly above the median size of 9,500 sq ft for new construction filings in Montgomery County. The estimated cost of $3,150,000 is above the county median of $800,000 for similar filings. The computed cost of $308 per sq ft is also above the county median of $100 per sq ft, reflecting the specialized nature of fire station construction.
The City of Conroe has six other TDLR-registered projects totaling $43,591,697, including Conroe Tower and various roadway improvements. SLI Group has worked on six other projects totaling $4,425,000, including banks and credit unions in the region. Nearby businesses include J & L Recycling, Antz Auto, and Tenaris Conroe. The site is located in ZIP code 77301, where the U.S. Census ACS 2023 five-year estimates report a population of about 36,835 and a median household income of $64,885.
Construction was scheduled to begin in December 2025, resulting in a planned build window of 182 days. This is close to the county median of 213 days for similar projects. Montgomery County unemployment was 4.8 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77301 (Conroe)
One email per change. Unsubscribe in one click. Privacy.
City of Conroe Fire Station 8 is a New Construction project located at 676 FM 3083 in Conroe, Texas. The project has an estimated value of $3.1M covering 10,224 sq ft. City of Conroe is the property owner and SLI Group is the design firm of record. The project was registered with TDLR on October 7, 2025.
Frequently Asked Questions
Is the fire station open?
TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The scheduled completion date of June 2026 has passed, but final status is pending.
Who is designing the building?
SLI Group is the design firm of record for the City of Conroe Fire Station 8 project, which includes three apparatus bays and living quarters.
How much does the project cost?
The estimated cost is $3,150,000 for 10,224 sq ft of new construction. This places the project in the top quarter of costs for new construction filings in Montgomery County.
Where is the fire station located?
The facility is located at 676 FM 3083 in Conroe, Montgomery County.
When was the project registered?
The project was registered with TDLR in October 2025. Plan review was completed in the same month, with construction scheduled to start in December 2025.
What is City of Conroe Fire Station 8?
City of Conroe Fire Station 8 is a new construction project at 676 FM 3083 in Conroe, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground-up Fire station with three apparatus bays and living quarters.
Is City of Conroe Fire Station 8 open in Conroe?
City of Conroe Fire Station 8 was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is City of Conroe Fire Station 8 located?
City of Conroe Fire Station 8 is located at 676 FM 3083, Conroe, TX, 77301, in Montgomery County.
Who is the owner or developer of City of Conroe Fire Station 8?
City of Conroe is the property owner/developer of record for City of Conroe Fire Station 8, per its TDLR project registration.
Who is the architect or design firm for City of Conroe Fire Station 8?
SLI Group is the design firm of record for City of Conroe Fire Station 8, according to its TDLR filing.
How much does City of Conroe Fire Station 8 cost and how big is it?
City of Conroe Fire Station 8 has an estimated construction value of $3.1M and approximately 10,224 square feet (about $308/sqft), based on its TDLR filing.
Scope of Work
Ground-up Fire station with three apparatus bays and living quarters.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
676 FM 3083, Conroe, TX, 77301
Related Projects
Same Owner
$125.8M totalWatch all construction in 77301 (Conroe)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Conroe?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.