Project intelligenceTDLR TABS2026003696New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements

Josey Lane (13400/13500) and Rawhide Parkway (1350, Farmers Branch, TX, 75234

Construction complete · Jul 2026Inspection Complete

Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements is a new construction project at Josey Lane (13400/13500) and Rawhide Parkway (1350, Farmers Branch, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2026). The project has an estimated value of $715K across about 4,400 sq ft.

Estimated project value
$715K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$163/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 20, 2025285 days across supplied datesAug 1, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    193 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements

The intersection of Josey Lane and Rawhide Parkway in Farmers Branch has completed its construction phase, passing its final TDLR accessibility inspection in July 2026. This project, filed as the Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements, consists of 4,400 square feet of new construction focused on pedestrian and signal infrastructure. The work includes the installation of a traffic signal, three crossings, sidewalk upgrades, ramps, pavement markings, and medians. The City of Farmers Branch serves as the owner of record for this public improvement project located in Dallas County.

Project Scope and Design

Kimley-Horn and Associates, Inc. is the design firm of record responsible for the engineering and planning of the intersection upgrades. The scope of work specifically targets the safety and accessibility of the junction, ensuring that the new signal and crossings meet current standards. Sharlynn L Keys is listed as the registered accessibility specialist for this filing. The project utilized public funds and is situated on public land, reflecting its status as a municipal infrastructure enhancement rather than a private commercial development.

Timeline and Cost

The project was registered with TDLR in October 2025, with plan review completed in the same month. Construction was scheduled to begin in May 2026, with a planned completion date of August 2026. The estimated cost for the improvements is $715,000, which calculates to $162 per square foot. This cost figure is below the median estimated cost for new construction filings in Dallas County, which stands at $950,000. However, the per-square-foot cost is above the county median of $125. The scheduled build window of 92 days is shorter than the county median of 243 days, indicating a focused and efficient construction schedule for this specific intersection upgrade.

The City of Farmers Branch has been involved in six other TDLR-registered projects totaling $9,390,000, including improvements to Denton Drive and the Farmers Branch Justice Center. Kimley-Horn and Associates, Inc. has six other registered projects totaling $17,360,000, demonstrating their extensive portfolio in both municipal and private sectors. The completion of this intersection project adds to the local infrastructure improvements in the 75234 ZIP code area, which has a population of about 32,998 and a median household income of $86,585 according to U.S. Census estimates.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75234 (Farmers Branch)

One email per change. Unsubscribe in one click. Privacy.

Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements is a New Construction project located at Josey Lane (13400/13500) and Rawhide Parkway (1350, Farmers Branch, TX 75234 in Farmers Branch, Texas. The project has an estimated value of $715K covering 4,400 sq ft. City of Farmers Branch is the property owner and Kimley-Horn and Associates, Inc. is the design firm of record. The project was registered with TDLR on October 20, 2025.

Frequently Asked Questions

Is the Josey Lane and Rawhide Parkway intersection open to traffic?

The construction is complete, and the project passed its final TDLR accessibility inspection in July 2026. The record confirms the physical improvements are finished, but specific traffic control status is not detailed in the filing.

Who designed the intersection improvements?

Kimley-Horn and Associates, Inc. is the design firm of record. Sharlynn L Keys is the registered accessibility specialist associated with the TDLR filing for this project.

What is the total cost of the project?

The estimated cost is $715,000. This amount covers the construction of the signal, three crossings, sidewalks, ramps, pavement markings, and medians at the 4,400 square foot site.

When did construction start and finish?

Construction was scheduled to start in May 2026. The project passed its final TDLR accessibility inspection in July 2026, confirming completion ahead of the August 2026 filing date.

Is this a private business project?

No, the owner of record is the City of Farmers Branch. The project involves public funds and public land, classified as new construction for a municipal intersection.

What is Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements?

Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements is a new construction project at Josey Lane (13400/13500) and Rawhide Parkway (1350 in Farmers Branch, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The intersection improvements at Josey Lane at Rawhide Parkway include the construction of a signal and three crossings. The project is about 4,400 SF of improvements to sidewalk, ramps, pavement marking, medians, and signal.

Is Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements open in Farmers Branch?

Construction on Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jul 2026. The building is finished and very likely open.

Where is Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements located?

Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements is located at Josey Lane (13400/13500) and Rawhide Parkway (1350, Farmers Branch, TX, 75234, in Dallas County.

Who is the owner or developer of Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements?

City of Farmers Branch is the property owner/developer of record for Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements, per its TDLR project registration.

Who is the architect or design firm for Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements?

Kimley-Horn and Associates, Inc. is the design firm of record for Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements, according to its TDLR filing.

How much does Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements cost and how big is it?

Farmers Branch Josey Lane at Rawhide Parkway Intersection Improvements has an estimated construction value of $715K and approximately 4,400 square feet (about $163/sqft), based on its TDLR filing.

Scope of Work

The intersection improvements at Josey Lane at Rawhide Parkway include the construction of a signal and three crossings. The project is about 4,400 SF of improvements to sidewalk, ramps, pavement marking, medians, and signal.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Josey Lane (13400/13500) and Rawhide Parkway (1350, Farmers Branch, TX, 75234

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75234 (Farmers Branch)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Farmers Branch?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.