Holly Ridge Phase 1 Landscape Improvements
Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX, 77471
Holly Ridge Phase 1 Landscape Improvements is a new construction project at Intersection of US 90A and Holly Ridge Blvd., Rosenberg, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $784K across about 334,585 sq ft.
- Estimated project value
- $784K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 334,585 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
35 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
86 days after the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77471 (Rosenberg)
One email per change. Unsubscribe in one click. Privacy.
Holly Ridge Phase 1 Landscape Improvements is a New Construction project located at Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX 77471 in Rosenberg, Texas. The project has an estimated value of $784K covering 334,585 sq ft. The Signorelli Company is the property owner and KGA DeForest Design, LLC is the design firm of record. The project was registered with TDLR on October 27, 2025.
Frequently Asked Questions
What is Holly Ridge Phase 1 Landscape Improvements?
Holly Ridge Phase 1 Landscape Improvements is a new construction project at Intersection of US 90A and Holly Ridge Blvd. in Rosenberg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Landscape, Sidewalk, Irrigation
Is Holly Ridge Phase 1 Landscape Improvements open in Rosenberg?
Construction on Holly Ridge Phase 1 Landscape Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Holly Ridge Phase 1 Landscape Improvements located?
Holly Ridge Phase 1 Landscape Improvements is located at Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX, 77471, in Fort Bend County.
Who is the owner or developer of Holly Ridge Phase 1 Landscape Improvements?
The Signorelli Company is the property owner/developer of record for Holly Ridge Phase 1 Landscape Improvements, per its TDLR project registration.
Who is the architect or design firm for Holly Ridge Phase 1 Landscape Improvements?
KGA DeForest Design, LLC is the design firm of record for Holly Ridge Phase 1 Landscape Improvements, according to its TDLR filing.
How much does Holly Ridge Phase 1 Landscape Improvements cost and how big is it?
Holly Ridge Phase 1 Landscape Improvements has an estimated construction value of $784K and approximately 334,585 square feet (about $2/sqft), based on its TDLR filing.
Scope of Work
Landscape, Sidewalk, Irrigation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX, 77471
Related Projects
Same Owner
$4.6M totalWatch all construction in 77471 (Rosenberg)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rosenberg?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.