Project intelligenceTDLR TABS2026004287New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Holly Ridge Phase 1 Landscape Improvements

Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX, 77471

Construction complete · Aug 2026Inspection Complete

Holly Ridge Phase 1 Landscape Improvements is a new construction project at Intersection of US 90A and Holly Ridge Blvd., Rosenberg, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $784K across about 334,585 sq ft.

Estimated project value
$784K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
334,585 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 27, 2025303 days across supplied datesAug 26, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    86 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77471 (Rosenberg)

One email per change. Unsubscribe in one click. Privacy.

Holly Ridge Phase 1 Landscape Improvements is a New Construction project located at Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX 77471 in Rosenberg, Texas. The project has an estimated value of $784K covering 334,585 sq ft. The Signorelli Company is the property owner and KGA DeForest Design, LLC is the design firm of record. The project was registered with TDLR on October 27, 2025.

Frequently Asked Questions

What is Holly Ridge Phase 1 Landscape Improvements?

Holly Ridge Phase 1 Landscape Improvements is a new construction project at Intersection of US 90A and Holly Ridge Blvd. in Rosenberg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Landscape, Sidewalk, Irrigation

Is Holly Ridge Phase 1 Landscape Improvements open in Rosenberg?

Construction on Holly Ridge Phase 1 Landscape Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Holly Ridge Phase 1 Landscape Improvements located?

Holly Ridge Phase 1 Landscape Improvements is located at Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX, 77471, in Fort Bend County.

Who is the owner or developer of Holly Ridge Phase 1 Landscape Improvements?

The Signorelli Company is the property owner/developer of record for Holly Ridge Phase 1 Landscape Improvements, per its TDLR project registration.

Who is the architect or design firm for Holly Ridge Phase 1 Landscape Improvements?

KGA DeForest Design, LLC is the design firm of record for Holly Ridge Phase 1 Landscape Improvements, according to its TDLR filing.

How much does Holly Ridge Phase 1 Landscape Improvements cost and how big is it?

Holly Ridge Phase 1 Landscape Improvements has an estimated construction value of $784K and approximately 334,585 square feet (about $2/sqft), based on its TDLR filing.

Scope of Work

Landscape, Sidewalk, Irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Intersection of US 90A and Holly Ridge Blvd., Rosenberg, TX, 77471

Location by street address

Watch all construction in 77471 (Rosenberg)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rosenberg?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.