Project intelligenceTDLR TABS2026004419New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TX219029 Common Ground the Grid (Stafford TX)

12223 Southwest Freeway, Stafford, TX, 77477

Opening ~Dec 2026Review Complete

TX219029 Common Ground the Grid (Stafford TX) is a new construction project at 12223 Southwest Freeway, Stafford, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $1.0M across about 4,000 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$250/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 28, 2025410 days across supplied datesDec 12, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    138 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    272 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About TX219029 Common Ground the Grid (Stafford TX)

A new Electrify America EV charging station is set for 12223 Southwest Freeway in Stafford, Texas. This new construction project involves the installation of a dedicated parking lot and charging infrastructure, including dispensers and power units, to serve electric vehicle drivers in the area. The facility is designed to accommodate 4,000 square feet of specialized equipment and supporting structures.

The project is owned by Stafford 59 & Airport LP, with Black & Veatch serving as the design firm of record. The scope of work specifically covers the construction of a parking area to house the EV charging facility, utilizing BTC equipment for the dispensers and power units. This infrastructure addition supports the growing network of fast-charging stations in the Houston metropolitan region.

Timeline and Regulatory Status

TDLR completed plan review in October 2025 and construction is scheduled to finish in December 2026, with work starting March 2026. The project was registered with TDLR in October 2025, and the status is now listed as Review Complete. This timeline indicates a construction window of approximately nine months, allowing for the detailed installation of high-power charging equipment and necessary site improvements.

The estimated cost for this project is $1,000,000. In Fort Bend County, the median estimated cost for similar new construction filings is $700,000, placing this project above the county median. The cost per square foot is calculated at $250, which is also higher than the county median of $100 per square foot for comparable projects. This higher cost reflects the specialized nature of EV charging infrastructure compared to standard commercial construction.

Black & Veatch has been involved in six other TDLR-registered Electrify America projects across Texas, including locations in Houston, Austin, and Fort Worth. These projects collectively total $3,100,000, demonstrating a consistent pattern of infrastructure development for EV charging. The presence of nearby businesses such as Walmart Supercenter, Waffle House, and Gringo’s Mexican Kitchen suggests the site is in a high-traffic commercial corridor, making the new charging station a convenient stop for travelers and local residents alike.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77477 (Stafford)

One email per change. Unsubscribe in one click. Privacy.

TX219029 Common Ground the Grid (Stafford TX) is a New Construction project located at 12223 Southwest Freeway, Stafford, TX 77477 in Stafford, Texas. The project has an estimated value of $1.0M covering 4,000 sq ft. Stafford 59 & Airport LP is the property owner and Black & Veatch is the design firm of record. The project was registered with TDLR on October 28, 2025.

Frequently Asked Questions

Is the Electrify America station in Stafford open?

No, the station is not open. Construction is scheduled to finish in December 2026, with work starting in March 2026. The TDLR record shows the project is in the review complete stage.

Who is the owner of the EV charging project?

The owner of record is Stafford 59 & Airport LP. Black & Veatch is the design firm responsible for the project plans and specifications.

What is the estimated cost of the project?

The estimated cost is $1,000,000. This is above the median cost of $700,000 for similar new construction projects in Fort Bend County.

When does construction start?

Construction is scheduled to start in March 2026. The project is expected to be completed by December 2026, following a nine-month build window.

What does the scope of work include?

The scope includes constructing a new parking lot to house the EV charging facility. It specifically includes dispensers, power units, and the use of BTC equipment.

What is TX219029 Common Ground the Grid (Stafford TX)?

TX219029 Common Ground the Grid (Stafford TX) is a new construction project at 12223 Southwest Freeway in Stafford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct/Install new Parking lot to house EV Charging facility to include dispenser and power units using BTC equipment.

Is TX219029 Common Ground the Grid (Stafford TX) open in Stafford?

TX219029 Common Ground the Grid (Stafford TX) is still under construction in Stafford, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is TX219029 Common Ground the Grid (Stafford TX) located?

TX219029 Common Ground the Grid (Stafford TX) is located at 12223 Southwest Freeway, Stafford, TX, 77477, in Fort Bend County.

Who is the owner or developer of TX219029 Common Ground the Grid (Stafford TX)?

Stafford 59 & Airport LP is the property owner/developer of record for TX219029 Common Ground the Grid (Stafford TX), per its TDLR project registration.

Who is the architect or design firm for TX219029 Common Ground the Grid (Stafford TX)?

Black & Veatch is the design firm of record for TX219029 Common Ground the Grid (Stafford TX), according to its TDLR filing.

How much does TX219029 Common Ground the Grid (Stafford TX) cost and how big is it?

TX219029 Common Ground the Grid (Stafford TX) has an estimated construction value of $1.0M and approximately 4,000 square feet (about $250/sqft), based on its TDLR filing.

Scope of Work

Construct/Install new Parking lot to house EV Charging facility to include dispenser and power units using BTC equipment.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12223 Southwest Freeway, Stafford, TX, 77477

Location by street address

Watch all construction in 77477 (Stafford)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Stafford?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.