Funding type
This project is privately funded, on private land for private use.
CyrusOne DFW11 | Tenant Fit Out in Whitney, TX
FM56 and CR3610A, Whitney, TX, 76692
CyrusOne DFW11 | Tenant Fit Out is a renovation/alteration project at FM56 and CR3610A, Whitney, in Bosque County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $225.0M across about 6,700 sq ft.
- Estimated project value
- $225.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $33.58K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
418 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
246 days after the preceding date shown.
Source: TDLR filing
View source record
📰About CyrusOne DFW11 | Tenant Fit Out
CyrusOne is planning a $225,000,000 renovation and alteration project for the DWF11 facility located at FM56 and CR3610A in Whitney, Bosque County. The scope of work focuses on an interior Level 01 data hall tenant fit-out, which includes data rack containment and support infrastructure. Additionally, the project encompasses 6,700 sq ft of Level 01 tenant office fit-out.
The project was registered with TDLR in October 2025. According to the filing, construction is scheduled to begin in December 2026, with completion targeted for August 2027. The status of the project is listed as Project Registered, indicating that plan review is pending.
Ownership and Design
CyrusOne is the owner and developer of record for this development. The design firm of record is JHET Architects, PLLC. Ronald L Davis is the registered accessibility specialist associated with the filing. This project is privately funded, on private land for private use.
CyrusOne has six other TDLR-registered projects in the region, with a combined estimated cost of $1,665,500,000. These include projects in Fort Worth and Whitney, such as Dfw8, Dfw17C, Dfw17B, and Dfw10. JHET Architects, PLLC also has six other registered projects totaling $1,721,000,000, including work in Red Oak and Fort Worth.
In terms of local context, the estimated cost for this renovation is above the county median for its type, placing it in the top quarter of Bosque County filings. The scheduled build window of 246 days is close to the county median of 222 days. The cost per square foot is significantly above the county median of $61.
The site is located in ZIP code 76692, which has a population of about 9,662 people. The median household income in this area is $55,455, and the median owner-occupied home value is $159,500. The housing stock is predominantly owner-occupied.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76692 (Whitney)
One email per change. Unsubscribe in one click. Privacy.
CyrusOne DFW11 | Tenant Fit Out is a Renovation/Alteration project located at FM56 and CR3610A in Whitney, Texas. The project has an estimated value of $225.0M covering 6,700 sq ft. CyrusOne is the property owner and JHET Architects, PLLC is the design firm of record. The project was registered with TDLR on October 30, 2025.
Frequently Asked Questions
What is the scope of the DWF11 project?
The project includes an interior Level 01 data hall tenant fit-out with data rack containment, support infrastructure, and 6,700 sq ft of Level 01 tenant office fit-out.
When is construction scheduled to start and finish?
Construction is scheduled to begin in December 2026, with completion targeted for August 2027. The project was registered with TDLR in October 2025.
Who is the owner of the DWF11 facility?
CyrusOne is the owner and developer of record. JHET Architects, PLLC is the design firm of record for this renovation project.
Is the DWF11 business currently open?
The TDLR record indicates the project is in the construction planning phase with a completion date targeted for August 2027. It does not confirm current business operations.
What is the estimated cost of the project?
The estimated cost for the DWF11 renovation and alteration is $225,000,000. This figure is above the county median for similar renovation projects in Bosque County.
What is CyrusOne DFW11 | Tenant Fit Out?
CyrusOne DFW11 | Tenant Fit Out is a renovation/alteration project at FM56 and CR3610A in Whitney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR LEVEL 01 DATA HALL TENANT FIT OUT INCLUDING DATA RACK CONTAINMENT AND SUPPORT INFRASTRUCTURE, AS WELL AS 6,700 SF OF LEVEL 01 TENANT OFFICE FIT OUT.
Is CyrusOne DFW11 | Tenant Fit Out open in Whitney?
CyrusOne DFW11 | Tenant Fit Out is still under construction in Whitney, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is CyrusOne DFW11 | Tenant Fit Out located?
CyrusOne DFW11 | Tenant Fit Out is located at FM56 and CR3610A, Whitney, TX, 76692, in Bosque County.
Who is the owner or developer of CyrusOne DFW11 | Tenant Fit Out?
CyrusOne is the property owner/developer of record for CyrusOne DFW11 | Tenant Fit Out, per its TDLR project registration.
Who is the architect or design firm for CyrusOne DFW11 | Tenant Fit Out?
JHET Architects, PLLC is the design firm of record for CyrusOne DFW11 | Tenant Fit Out, according to its TDLR filing.
How much does CyrusOne DFW11 | Tenant Fit Out cost and how big is it?
CyrusOne DFW11 | Tenant Fit Out has an estimated construction value of $225.0M and approximately 6,700 square feet (about $33.58K/sqft), based on its TDLR filing.
Scope of Work
INTERIOR LEVEL 01 DATA HALL TENANT FIT OUT INCLUDING DATA RACK CONTAINMENT AND SUPPORT INFRASTRUCTURE, AS WELL AS 6,700 SF OF LEVEL 01 TENANT OFFICE FIT OUT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
FM56 and CR3610A, Whitney, TX, 76692
Related Projects
Same Owner
$4.19B totalWatch all construction in 76692 (Whitney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Whitney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.