Bosque County, TX Construction Projects

10 Cities · 61 Projects

61
Projects
$2.92B
Total Value
32
New Builds
29
Renovations
10
Cities
1.2M
Sq Ft

What is being built in Bosque County, Texas?

Bosque County, Texas has 61 construction and development projects on file worth $2.92B — 32 new construction and 29 renovations or remodels, spread across 10 cities and towns. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

Which cities in Bosque County have the most construction?

The most active cities for construction in Bosque County are Clifton (28 projects), Whitney (6 projects), Valley Mills (6 projects), Morgan (5 projects), Meridian (4 projects). Counts reflect the filings on this page, so a city with a single large development can carry more value than one with more projects.

What new developments are coming to Bosque County?

The most recently filed new-construction projects in Bosque County are SH 22 (CSJ: 0121-01-050) ($866K), CyrusOne DFW17C ($430.0M), CyrusOne DFW17B ($500.0M), FSSB ATM Drives ($100K). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens.

Bosque County Map

Project locations across the county

Bosque County Economy

Federal Reserve Economic Data (FRED)

4.6%→
Unemployment Rate
8K
Labor Force
Available workers
+4.5%
Unemployment YoY
Rising
Bosque County economy: 4.6% unemployment with 8K labor force supporting 61 construction projects worth $2.92B.
2 New Projects in Last 6 Months
$1.4M in new investment
39
Closed
5
Review Complete
10
Registered
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 61 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Bosque County
Estimated construction value$2.9BSum of 58 shown records with value
Records in view61 / 61Ready to inspect and compare
Largest record’s share25.6%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect3 without reported value · Smaller records grouped
Bosque County

Comparisons use only these 61 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

All Projects

61 TDLR · 0 Site Plans

Showing 20 of 61 listed TDLR filings

Registered
$500K

Caseys Store #4879

702 West Avenue C, Valley Mills, TX 76689

4,033 sqftOct 8, 2026
Review Complete
$866K

SH 22 (CSJ: 0121-01-050)

From: 1860' West of FM 219 To: CR 3602, Clifton, TX 76634

67,524 sqftSep 10, 2026
Review Complete
$180K

TSC Clifton Fusion

1207 NORTH AVE G, Clifton, TX 76634

22,403 sqftDec 11, 2025
Closed
$100K

FSSB ATM Drives

101 South Avenue G, Clifton, TX 76634

2,000 sqftOct 23, 2025
Review Complete
$50K

Leaned

101 us-69, Leonard, TX 75452

4,000 sqftAug 14, 2024
Inspection Complete
$5.4M

Pathway of Life Church

2724 N Beltline Rd PO Box 520, Sunnyvale, TX 76689

29,000 sqftMay 2, 2024

Bosque County construction: common questions

How many construction projects are in Bosque County, Texas?
Bosque County has 61 registered construction projects worth $2.92B, covering 1,210,993 square feet of development. The average project is valued at $47.9M.
What kind of construction is happening in Bosque County?
Bosque County has 32 new construction projects (52%) and 29 renovation or remodel projects (48%) on file. Work spans commercial, residential, public and mixed-use development.
Who is building in Bosque County?
The property owners with the highest declared value on file in Bosque County are CyrusOne, CLIFTON ISD, VALLEY MILLS ISD. The architecture and design firms appearing most often on Bosque County filings are JHET Architects, PLLC, VLK ARCHITECTS INC, CLAYCOMB ASSOCIATES ARCHITECTS.
Where does this Bosque County construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.