Property Owner1 not closed in shown records

Pathway of Life Full Gospel Church

PO BOX 852291, Mesquite, Texas 75185
Kelly James

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$14.2M
Portfolio Value
1
Not closed · shown
58,429
Sq ft · shown
1
Cities · shown
$7.1M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Pathway of Life Full Gospel Church files a new project.

Export full work history

Download Pathway of Life Full Gospel Church's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Pathway of Life Full Gospel Church

Every company tracking $10M+ in active construction project value

11,000+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About Pathway of Life Full Gospel Church

Pathway of Life Full Gospel Church is named as an owner in 2 construction filings in Dallas-Fort Worth and Bosque County, with a reported portfolio value of $14.2M. The 2 loaded filings include 2 new construction records and 0 renovation/alteration records, representing 58,429 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $7.1M
  • Square footage in shown records: 58,429 sq ft

Market Presence

  • Sunnyvale2 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including Broadstone Design Group. These are filing statuses, not independent observations of work on site.

Activity Over Time

2024
2
Median project: $8.8MAvg cost/sqft: $242/sqftPeak year: 2024 (2 projects)

Activity Timeline

First Project
May 2024
Latest Project
May 2024
1
Not closed
1
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$8.8M combined

Project Status

Closed
1(50%)
Inspection Complete
1(50%)