DFW THE DEEP END TAPROOM + KITCHEN in Dfw Airport, TX

2040 S International Parkway Space #C26A209, Dfw Airport, TX, 75261

Construction complete · Aug 2026Inspection Complete

DFW THE DEEP END TAPROOM + KITCHEN is a renovation/alteration project at 2040 S International Parkway Space #C26A209, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.0M across about 1,176 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,176 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$850/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 5, 2025274 days across supplied datesAug 6, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    185 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About DFW THE DEEP END TAPROOM + KITCHEN

The Deep END Taproom + Kitchen occupies 1,176 sq ft in DFW Airport Concourse C, completing a $1,000,000 renovation project. Located at 2040 S International Parkway Space #C26A209, this facility represents a significant investment in the airport's hospitality infrastructure. The project passed its final TDLR accessibility inspection in August 2026, confirming that the construction phase is complete and the building meets required standards.

Project Scope and Design

The renovation involved transforming the space into a new Deep End brewery. Hill Foley Rossi & Associates served as the design firm of record, guiding the architectural and functional aspects of the build. The scope of work, as detailed in the filing, focused on establishing the brewing and dining operations within the existing Concourse C framework. This dedicated design effort supports the creation of a tailored environment for travelers and airport staff.

DFW Airport is listed as the owner and developer of record for this specific unit. The project is privately funded on private land for private use, distinguishing it from public infrastructure projects. This private funding model allows for specific operational goals and interior finishes that align with the brand identity of Deep End. The collaboration between the airport management and private business interests highlights the diverse economic activity within the terminal.

Timeline and Regulatory Compliance

The project registered with the Texas Department of Licensing and Regulation in November 2025. Plan review was completed in January 2026, coinciding with the scheduled construction start date. The filing indicated a completion date of February 2026. However, the final inspection did not pass until August 2026, suggesting a timeline extension or additional review processes. This delay is not uncommon in complex renovation projects where final adjustments are required to meet code compliance.

The cost per square foot for this renovation is $850. This figure is above the county median of $79 per square foot for similar renovation and alteration projects in Tarrant County. The estimated total cost of $1,000,000 places this project in the top quarter of cost estimates for its type in the region. The scheduled build window of 32 days was shorter than the county median of 92 days, indicating an efficient initial planning phase, though the final completion date reflects the actual duration of work and inspection.

Michael J Love is the registered accessibility specialist associated with this filing. His role ensures that the facility meets the specific accessibility standards required for public and private commercial spaces in Texas. The completion of the inspection in August 2026 marks the end of the regulatory process for this specific build. The project is now considered complete from a construction and compliance standpoint, ready for its intended operational use.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dfw Airport)

One email per change. Unsubscribe in one click. Privacy.

DFW THE DEEP END TAPROOM + KITCHEN is a Renovation/Alteration project located at 2040 S International Parkway Space #C26A209, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $1.0M covering 1,176 sq ft. DFW Airport is the property owner and Hill Foley Rossi & Associates is the design firm of record. The project was registered with TDLR on November 5, 2025.

Frequently Asked Questions

Is the Deep END Taproom + Kitchen open?

The TDLR record shows construction is complete and the final inspection passed in August 2026. This confirms the building is finished, but it does not confirm the business is operating or open to the public.

Who is the design firm for this project?

Hill Foley Rossi & Associates is the design firm of record. They were responsible for the architectural and design aspects of the renovation for the Deep END Taproom + Kitchen in DFW Airport Concourse C.

What is the total size of the renovation?

The project covers 1,176 sq ft. This space was renovated to create the new Deep End brewery and kitchen facility within the existing airport infrastructure.

When did the final inspection pass?

The final TDLR accessibility inspection passed in August 2026. This date is later than the February 2026 completion date listed on the original filing, indicating the project took longer than initially scheduled.

What is DFW THE DEEP END TAPROOM + KITCHEN?

DFW THE DEEP END TAPROOM + KITCHEN is a renovation/alteration project at 2040 S International Parkway Space #C26A209 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Deep End brewery in DFW Airport Concourse C

Is DFW THE DEEP END TAPROOM + KITCHEN open in Dfw Airport?

Construction on DFW THE DEEP END TAPROOM + KITCHEN is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is DFW THE DEEP END TAPROOM + KITCHEN located?

DFW THE DEEP END TAPROOM + KITCHEN is located at 2040 S International Parkway Space #C26A209, Dfw Airport, TX, 75261, in Tarrant County.

Who is the owner or developer of DFW THE DEEP END TAPROOM + KITCHEN?

DFW Airport is the property owner/developer of record for DFW THE DEEP END TAPROOM + KITCHEN, per its TDLR project registration.

Who is the architect or design firm for DFW THE DEEP END TAPROOM + KITCHEN?

Hill Foley Rossi & Associates is the design firm of record for DFW THE DEEP END TAPROOM + KITCHEN, according to its TDLR filing.

How much does DFW THE DEEP END TAPROOM + KITCHEN cost and how big is it?

DFW THE DEEP END TAPROOM + KITCHEN has an estimated construction value of $1.0M and approximately 1,176 square feet (about $850/sqft), based on its TDLR filing.

Scope of Work

New Deep End brewery in DFW Airport Concourse C

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2040 S International Parkway Space #C26A209, Dfw Airport, TX, 75261

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75261 (Dfw Airport)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dfw Airport?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.