Funding type
This project is privately funded, on private land for private use.
DFW American Terminal C Ph2-3 Fit-Out
2040 North International Parkway, Dfw Airport, TX, 75261
DFW American Terminal C Ph2-3 Fit-Out is a renovation/alteration project at 2040 North International Parkway, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2030. The project has an estimated value of $100.0M across about 850,000 sq ft.
- Estimated project value
- $100.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 850,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $118/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
172 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,096 days after the preceding date shown.
Source: TDLR filing
View source record
📰About DFW American Terminal C Ph2-3 Fit-Out
The DFW Terminal C Phase 2-3 Fit-Out project involves an 850,000 sq ft interior renovation at 2040 North International Parkway in Dfw Airport. The filing, registered with TDLR in September 2026, details a comprehensive scope of work for Terminal C, with construction targeted for March 2030.
Dfw Airport is the owner of record for this $100,000,000 renovation. The project is privately funded and located on private land in Tarrant County. Corgan Associates, Inc. serves as the design firm, having registered six other projects with TDLR totaling $41,375,000. The registered accessibility specialist for this filing is Ronald L Davis.
Scope and Scale
The work covers interior fit-out for baggage claim areas, security checkpoints, concessions white boxes, offices, restrooms, break rooms, back-of-house areas, ready rooms, and gate hold lounges. At 850,000 sq ft, this project is significantly larger than the median renovation in Tarrant County, which is 3,900 sq ft. The estimated cost of $100,000,000 places this project in the top quarter of filings for its type in the county, where the median estimated cost is $250,000.
The construction timeline is scheduled for March 2027 through March 2030, a 1,096-day window. This duration is longer than the county median of 92 days for similar renovation and alteration projects. The cost per square foot is $118, which is above the county median of $79 per square foot.
Dfw Airport has six other TDLR-registered projects totaling $3,005,000, including a $450,000 project registered and a $1,500,000 rental car center project with review complete. The current status of the DFW Terminal C project is Project Registered, with plan review pending. The TDLR record confirms the registration date of September 2026 and the targeted completion date of March 2030.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
DFW American Terminal C Ph2-3 Fit-Out is a Renovation/Alteration project located at 2040 North International Parkway, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $100.0M covering 850,000 sq ft. DFW Airport is the property owner and Corgan Associates, Inc. is the design firm of record. The project was registered with TDLR on September 10, 2026.
Frequently Asked Questions
What is the current status of the DFW Terminal C renovation?
The project is registered with TDLR and plan review is pending. Construction is scheduled to start in March 2027, with completion targeted for March 2030.
Who is the owner and design firm for this project?
DFW Airport is the owner of record. Corgan Associates, Inc. is the design firm of record for the 850,000 sq ft interior fit-out.
How large is the DFW Terminal C Phase 2-3 Fit-Out?
The project covers 850,000 sq ft of interior space, including baggage claim, security, concessions, and gate hold lounges at Terminal C.
What is the estimated cost of the renovation?
The estimated cost is $100,000,000, which is above the county median for renovation and alteration projects in Tarrant County.
What is DFW American Terminal C Ph2-3 Fit-Out?
DFW American Terminal C Ph2-3 Fit-Out is a renovation/alteration project at 2040 North International Parkway in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior fit out for baggage claim, security check point, concessions white boxes, offices, restroom, break rooms, BOH, ready rooms, and gate hold lounges at Terminal C. (850,000 SF)
Is DFW American Terminal C Ph2-3 Fit-Out open in Dfw Airport?
DFW American Terminal C Ph2-3 Fit-Out is still under construction in Dfw Airport, TX, with an estimated completion of Mar 2030 according to its TDLR registration.
Where is DFW American Terminal C Ph2-3 Fit-Out located?
DFW American Terminal C Ph2-3 Fit-Out is located at 2040 North International Parkway, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of DFW American Terminal C Ph2-3 Fit-Out?
DFW Airport is the property owner/developer of record for DFW American Terminal C Ph2-3 Fit-Out, per its TDLR project registration.
Who is the architect or design firm for DFW American Terminal C Ph2-3 Fit-Out?
Corgan Associates, Inc. is the design firm of record for DFW American Terminal C Ph2-3 Fit-Out, according to its TDLR filing.
How much does DFW American Terminal C Ph2-3 Fit-Out cost and how big is it?
DFW American Terminal C Ph2-3 Fit-Out has an estimated construction value of $100.0M and approximately 850,000 square feet (about $118/sqft), based on its TDLR filing.
Scope of Work
Interior fit out for baggage claim, security check point, concessions white boxes, offices, restroom, break rooms, BOH, ready rooms, and gate hold lounges at Terminal C. (850,000 SF)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2040 North International Parkway, Dfw Airport, TX, 75261
Related Projects
Same Owner
$101.1M totalNearby Projects
Within 1 kmWatch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.