Jordan Lane Office Complex Building 4 in Woodway, TX
9108 Jordan Lane, Woodway, TX, 76712
Jordan Lane Office Complex Building 4 is a new construction project at 9108 Jordan Lane, Woodway, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $750K across about 5,018 sq ft.
- Estimated project value
- $750K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,018 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $149/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
14 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
44 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
321 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Jordan Lane Office Complex Building 4
The Jordan Lane Office Complex Building 4 is a new 5,018 sq ft shell structure located at 9108 Jordan Lane in Woodway, Texas. This project, filed with the Texas Department of Licensing and Regulatory Affairs (TDLR), is estimated to cost $750,000, representing a construction cost of approximately $149 per square foot. The building is designed to accommodate future office tenants, providing a new commercial option in the Woodway area of McLennan County.
HK Enterprises LTD serves as the owner and developer of record for this development. The architectural design is handled by Sterling & Kap Architects, a firm with a portfolio that includes other commercial projects in the Waco and McGregor regions. The registered accessibility specialist for the project is John Tyler Johnson, ensuring the facility meets state standards for accessibility compliance.
Construction Timeline and Status
Construction on the site began in December 2025. TDLR completed the plan review process in January 2026. The current status of the filing is Review Complete, and the project is scheduled to finish in December 2026. This timeline indicates a construction period of approximately one year, which is longer than the median scheduled build window of 245 days for similar new construction filings in McLennan County.
This geographic classification suggests the property is not subject to the specific flood insurance requirements mandated for areas within the mapped floodplain. The project is privately funded and situated on private land for private use, distinguishing it from public infrastructure or subsidized housing developments.
HK Enterprises LTD is responsible for four other TDLR-registered projects in the same complex, with a combined estimated value of $3,188,600. These include Buildings 3, 6, and two additional structures identified as the Jordan Lane Office Complex. The total investment in this specific development phase reflects a significant commitment to expanding office space in the Woodway community, which has a population of approximately 28,719 and a median household income of $96,267 according to U.S. Census estimates for the 76712 ZIP code.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76712 (Woodway)
One email per change. Unsubscribe in one click. Privacy.
Jordan Lane Office Complex Building 4 is a New Construction project located at 9108 Jordan Lane, Woodway, TX 76712 in Woodway, Texas. The project has an estimated value of $750K covering 5,018 sq ft. HK Enterprises LTD is the property owner and Sterling & Kap Architects is the design firm of record. The project was registered with TDLR on November 17, 2025.
Frequently Asked Questions
When is the Jordan Lane Office Complex Building 4 scheduled to be completed?
The project is scheduled to finish in December 2026. Construction began in December 2025, and TDLR completed the plan review in January 2026.
Who is the owner and developer of this building?
HK Enterprises LTD is the owner and developer of record. The design firm is Sterling & Kap Architects, and John Tyler Johnson is the registered accessibility specialist.
What is the estimated cost and size of the building?
The building is 5,018 sq ft with an estimated cost of $750,000. This calculates to approximately $149 per square foot, which is close to the county median of $145.
Is the building open for business?
The facts provided only cover the construction status. The project is scheduled to finish in December 2026, so it is not yet open for occupancy.
What is Jordan Lane Office Complex Building 4?
Jordan Lane Office Complex Building 4 is a new construction project at 9108 Jordan Lane in Woodway, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New shell building for future office tenants.
Is Jordan Lane Office Complex Building 4 open in Woodway?
Jordan Lane Office Complex Building 4 is still under construction in Woodway, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Jordan Lane Office Complex Building 4 located?
Jordan Lane Office Complex Building 4 is located at 9108 Jordan Lane, Woodway, TX, 76712, in McLennan County.
Who is the owner or developer of Jordan Lane Office Complex Building 4?
HK Enterprises LTD is the property owner/developer of record for Jordan Lane Office Complex Building 4, per its TDLR project registration.
Who is the architect or design firm for Jordan Lane Office Complex Building 4?
Sterling & Kap Architects is the design firm of record for Jordan Lane Office Complex Building 4, according to its TDLR filing.
How much does Jordan Lane Office Complex Building 4 cost and how big is it?
Jordan Lane Office Complex Building 4 has an estimated construction value of $750K and approximately 5,018 square feet (about $149/sqft), based on its TDLR filing.
Scope of Work
New shell building for future office tenants.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
9108 Jordan Lane, Woodway, TX, 76712
Related Projects
Same Owner
$4.3M totalNearby Projects
Within 0.6 miWatch all construction in 76712 (Woodway)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Woodway?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.