Maplewood Meadows Phase 2A & 2B in Forney, TX

9889 FM 2932, Forney, TX, 75126

Opening ~Sep 2027Review Complete

Maplewood Meadows Phase 2A & 2B is a new construction project at 9889 FM 2932, Forney, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2027. The project has an estimated value of $140K across about 9,836 sq ft.

Estimated project value
$140K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,836 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$14/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 17, 2025667 days across supplied datesSep 15, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    118 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    549 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Maplewood Meadows Phase 2A & 2B

Maplewood Meadows Phase 2A & 2B is a new construction project located at 9889 FM 2932 in Forney, Kaufman County. The scope of work includes approximately 502,560 square feet of right-of-way, 9,836 linear feet of sidewalk, and 36 ramps. The project is estimated to cost $139,923, which works out to $14 per square foot of the specified sidewalk area.

Forestar (USA) Real Estate Group Inc. is the owner of record for this development. Pape-Dawson serves as the design firm of record. Sharlynn L Keys is the registered accessibility specialist associated with the filing. The project involves public funds, public land, or is a Federally funded roadway project, indicating significant public investment in local infrastructure.

TDLR completed plan review in November 2025, and the project is scheduled to finish in September 2027. Construction is set to begin in March 2026. This timeline establishes a build window of 549 days, which is longer than the county median of 242 days for similar new construction filings. The status is Review Complete, with the next major milestone being the start of physical construction.

Context and Comparisons

The estimated cost of $139,923 is below the county median of $1,200,000 for new construction projects in Kaufman County. Similarly, the $14 per square foot cost is significantly below the county median of $144 per square foot. These figures place the project in the bottom quarter of costs for its type within the county, reflecting a specific scope focused on linear infrastructure rather than large-scale building footprints.

Forestar (USA) Real Estate Group Inc. has six other TDLR-registered projects totaling $2,629,366, including developments in New Waverly and Splendora. Pape-Dawson, the design firm, has six other registered projects totaling $7,256,414 across locations like Fort Worth, Boerne, and San Antonio. This suggests both the developer and the design firm are active participants in the Texas construction market with a portfolio of varied projects.

This geographic detail is relevant for construction planning and infrastructure durability. The project is part of a broader development effort in the Forney area, contributing to the local housing and transportation infrastructure landscape.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75126 (Forney)

One email per change. Unsubscribe in one click. Privacy.

Maplewood Meadows Phase 2A & 2B is a New Construction project located at 9889 FM 2932 in Forney, Texas. The project has an estimated value of $140K covering 9,836 sq ft. Forestar (USA) Real Estate Group Inc. is the property owner and Pape-Dawson is the design firm of record. The project was registered with TDLR on November 17, 2025.

Frequently Asked Questions

When will construction start and end?

Construction is scheduled to start in March 2026. The project is scheduled to finish in September 2027, following the completion of TDLR plan review in November 2025.

Who is the developer and design firm?

Forestar (USA) Real Estate Group Inc. is the owner of record. Pape-Dawson is the design firm of record for the Maplewood Meadows Phase 2A & 2B project.

What is the estimated cost?

The estimated cost for the project is $139,923. This figure covers the new construction of approximately 502,560 square feet of right-of-way, 9,836 linear feet of sidewalk, and 36 ramps.

Is the project in a flood zone?

It is located in zone X, which indicates it is outside the designated flood hazard area.

Who is the registered accessibility specialist?

Sharlynn L Keys is the registered accessibility specialist listed in the TDLR filing for this project. This role ensures compliance with accessibility standards during the design and construction process.

What is Maplewood Meadows Phase 2A & 2B?

Maplewood Meadows Phase 2A & 2B is a new construction project at 9889 FM 2932 in Forney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 502,560 SF ROW, 9836 LF of sidewalk and 36 ramps

Is Maplewood Meadows Phase 2A & 2B open in Forney?

Maplewood Meadows Phase 2A & 2B is still under construction in Forney, TX, with an estimated completion of Sep 2027 according to its TDLR registration.

Where is Maplewood Meadows Phase 2A & 2B located?

Maplewood Meadows Phase 2A & 2B is located at 9889 FM 2932, Forney, TX, 75126, in Kaufman County.

Who is the owner or developer of Maplewood Meadows Phase 2A & 2B?

Forestar (USA) Real Estate Group Inc. is the property owner/developer of record for Maplewood Meadows Phase 2A & 2B, per its TDLR project registration.

Who is the architect or design firm for Maplewood Meadows Phase 2A & 2B?

Pape-Dawson is the design firm of record for Maplewood Meadows Phase 2A & 2B, according to its TDLR filing.

How much does Maplewood Meadows Phase 2A & 2B cost and how big is it?

Maplewood Meadows Phase 2A & 2B has an estimated construction value of $140K and approximately 9,836 square feet (about $14/sqft), based on its TDLR filing.

Scope of Work

Approximately 502,560 SF ROW, 9836 LF of sidewalk and 36 ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9889 FM 2932, Forney, TX, 75126

Loading location map…
32.67303, -96.40750

Watch all construction in 75126 (Forney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.