Funding type
This project is privately funded, on private land for private use.
DFW Terminal D CDC Suite - Centers for Disease Control in Dfw Airport, TX
2333 S International Pkwy D29F418, Dfw Airport, TX, 75261
DFW Terminal D CDC Suite - Centers for Disease Control is a renovation/alteration project at 2333 S International Pkwy D29F418, Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $1.8M across about 1,950 sq ft.
- Estimated project value
- $1.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,950 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $923/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
13 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
47 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
45 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
197 days after the preceding date shown.
Source: TDLR filing
View source record
📰About DFW Terminal D CDC Suite - Centers for Disease Control
The DFW International Airport Terminal D renovation is complete, having passed its final TDLR accessibility inspection in October 2026. This project, filed under the name DFW Terminal D CDC Suite - Centers for Disease Control, involved interior updates to an existing suite at 2333 S International Pkwy D29F418 in Dfw Airport, Texas. The work focused on relocating three office spaces, a conference room, open seating, and accessory areas within a total area of 1,950 sq ft.
DFW Airport served as the owner of record for this renovation, which carried an estimated cost of $1,800,000. This figure translates to a cost of $923 per square foot, a rate that is above the county median of $72 for similar renovation and alteration projects in Dallas County. The project was registered with the Texas Department of Licensing and Regulation in December 2025, with plan review completed by February 2026. Construction began in December 2025, aligning with the scheduled build window that matches the county median of 92 days.
Project Scope and Design
Gensler, the design firm of record, oversaw the architectural and planning aspects of this interior update. The scope was strictly limited to the relocation and rearrangement of existing spaces within the CDC Suite, rather than new construction or expansion. Konny Deffner was listed as the registered accessibility specialist responsible for ensuring the design met required standards. The project was privately funded on private land for private use, distinct from larger public infrastructure projects at the airport.
DFW Airport has six other TDLR-registered projects, totaling $113,630,000, including significant work on Terminal E Satellite and Terminal C. Gensler has also been the design firm for six other projects totaling $47,500,000, ranging from Houston commercial buildings to Frisco financial facilities. While this specific 1,950 sq ft renovation is modest in size compared to the median 4,226 sq ft for Dallas County alterations, its cost per square foot is significantly higher, reflecting the specialized nature of the interior fit-out work.
The project timeline moved from registration in December 2025 to final inspection in October 2026. Although the filing listed a completion date of March 2026, the official TDLR status confirms that the final TDLR accessibility inspection was passed in October 2026, marking the definitive end of the construction and compliance process. The record does not indicate any delays or additional phases beyond this final inspection.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
DFW Terminal D CDC Suite - Centers for Disease Control is a Renovation/Alteration project located at 2333 S International Pkwy D29F418, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $1.8M covering 1,950 sq ft. DFW Airport is the property owner and Gensler is the design firm of record. The project was registered with TDLR on December 9, 2025.
Frequently Asked Questions
What is the current status of the DFW Terminal D CDC Suite renovation?
The project is complete. It passed its final TDLR accessibility inspection in October 2026, confirming that all construction and compliance requirements have been met.
Who was the design firm for this project?
Gensler was the design firm of record. They were responsible for the interior updates and relocation of office and conference spaces within the suite.
How much did the renovation cost?
The estimated cost for the 1,950 sq ft renovation was $1,800,000. This amounts to $923 per square foot, which is above the county median for similar work.
What specific work was done in the CDC Suite?
The scope involved interior updates to an existing CDC Suite, specifically relocating three office spaces, a conference room, open seating, and accessory spaces.
Is the business open to the public?
The TDLR record only confirms construction completion and accessibility inspection. It does not provide information on public operating hours or business status.
What is DFW Terminal D CDC Suite - Centers for Disease Control?
DFW Terminal D CDC Suite - Centers for Disease Control is a renovation/alteration project at 2333 S International Pkwy D29F418 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of the project is interior updates to an existing CDC Suite. relocating 3 office spaces, a conference room, open seating and accessory spaces. with a total of 1,950 sf.
Is DFW Terminal D CDC Suite - Centers for Disease Control open in Dfw Airport?
Construction on DFW Terminal D CDC Suite - Centers for Disease Control is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is DFW Terminal D CDC Suite - Centers for Disease Control located?
DFW Terminal D CDC Suite - Centers for Disease Control is located at 2333 S International Pkwy D29F418, Dfw Airport, TX, 75261, in Dallas County.
Who is the owner or developer of DFW Terminal D CDC Suite - Centers for Disease Control?
DFW Airport is the property owner/developer of record for DFW Terminal D CDC Suite - Centers for Disease Control, per its TDLR project registration.
Who is the architect or design firm for DFW Terminal D CDC Suite - Centers for Disease Control?
Gensler is the design firm of record for DFW Terminal D CDC Suite - Centers for Disease Control, according to its TDLR filing.
How much does DFW Terminal D CDC Suite - Centers for Disease Control cost and how big is it?
DFW Terminal D CDC Suite - Centers for Disease Control has an estimated construction value of $1.8M and approximately 1,950 square feet (about $923/sqft), based on its TDLR filing.
Scope of Work
The scope of the project is interior updates to an existing CDC Suite. relocating 3 office spaces, a conference room, open seating and accessory spaces. with a total of 1,950 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2333 S International Pkwy D29F418, Dfw Airport, TX, 75261
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.80B totalWatch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.