County Park Improvements in Canutillo, TX
1301 Zinn Rd, Canutillo, TX, 79835
County Park Improvements is a additions to existing building project at 1301 Zinn Rd, Canutillo, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $400K across about 1 sq ft.
- Estimated project value
- $400K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $400.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 days
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
7 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
1 days after the preceding date shown.
Source: TDLR filing
View source record
📰About County Park Improvements
El Paso County filed a $400,000 project named County Park Improvements to upgrade Westway Park at 1301 Zinn Rd in Canutillo. The scope includes adding a 10-foot-wide asphalt running trail along an existing path, installing bollard lights, repairing fencing, and placing a new water fountain near the playground. This work is classified as additions to an existing building.
Project Scope and Design
MNK Architects, Inc. is the design firm of record for County Park Improvements. The project involves public funds and is located on public land in El Paso County. The estimated cost of $400,000 is above the county median of $250,000 for similar additions to existing buildings. The scheduled build window of 7 days is shorter than the county median of 183 days for this type of work.
Eckhard K Fennig is the registered accessibility specialist associated with the filing. The project was registered with TDLR in January 2026, and plan review was completed in the same month. Construction was scheduled to begin and finish in January 2026 according to the filing dates.
Current Status and Location
The TDLR status is listed as Review Complete. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project is located in ZIP code 79835, which has a population of about 12,289 and a median household income of $42,955 according to U.S. Census ACS 2023 five-year estimates.
El Paso County has six other TDLR-registered projects totaling $31,156,887, including the Office of the Medical Examiner and Ysleta Annex Community Kitchen. MNK Architects, Inc. has six other TDLR-registered projects totaling $51,447,662, including the Corbin-Sambrano Wellness Center and Northwest Early College High School. The El Paso County unemployment rate was 4.8 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79835 (Canutillo)
One email per change. Unsubscribe in one click. Privacy.
County Park Improvements is a Additions to Existing Building project located at 1301 Zinn Rd, Canutillo, TX 79835 in Canutillo, Texas. The project has an estimated value of $400K covering 1 sq ft. El Paso County is the property owner and MNK Architects, Inc. is the design firm of record. The project was registered with TDLR on January 7, 2026.
Frequently Asked Questions
What is being built at Westway Park?
The County Park Improvements project adds a 10-foot-wide asphalt running trail, bollard lights, fencing repairs, and a new water fountain near the playground.
Who is the owner of the project?
El Paso County is the owner and developer of record for these improvements at 1301 Zinn Rd in Canutillo.
Is the project finished?
The filing states construction was scheduled to finish in January 2026, but TDLR has not yet recorded a final inspection, so completion is not confirmed in the public record.
How much does the project cost?
The estimated cost is $400,000, which is above the median cost of $250,000 for similar projects in El Paso County.
What is County Park Improvements?
County Park Improvements is a additions to existing building project at 1301 Zinn Rd in Canutillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 10ft wide Asphalt Running Trail along existing path with bollard lights & some fencing repair. New water fountain near playground
Is County Park Improvements open in Canutillo?
County Park Improvements was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is County Park Improvements located?
County Park Improvements is located at 1301 Zinn Rd, Canutillo, TX, 79835, in El Paso County.
Who is the owner or developer of County Park Improvements?
El Paso County is the property owner/developer of record for County Park Improvements, per its TDLR project registration.
Who is the architect or design firm for County Park Improvements?
MNK Architects, Inc. is the design firm of record for County Park Improvements, according to its TDLR filing.
How much does County Park Improvements cost and how big is it?
County Park Improvements has an estimated construction value of $400K and approximately 1 square feet (about $400.00K/sqft), based on its TDLR filing.
Scope of Work
10ft wide Asphalt Running Trail along existing path with bollard lights & some fencing repair. New water fountain near playground
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1301 Zinn Rd, Canutillo, TX, 79835
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$57.1M totalWatch all construction in 79835 (Canutillo)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Canutillo?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.