Project intelligenceTDLR TABS2026009802Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Alex Sanger Preparatory School- Renovation in Dallas, TX

8410 Sanger Leandro Drive, Dallas, TX, 75218

Opening ~Aug 2027Review Complete

Alex Sanger Preparatory School- Renovation is a renovation/alteration project at 8410 Sanger Leandro Drive, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $9.2M across about 16,971 sq ft.

Estimated project value
$9.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,971 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$544/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 12, 2026596 days across supplied datesAug 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    131 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    427 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Alex Sanger Preparatory School- Renovation

The Alex Sanger Preparatory School in Dallas is undergoing a $9,234,090 renovation that spans 16,971 square feet of existing space. The project, registered with TDLR as "Alex Sanger Preparatory School- Renovation," involves alterations to the administration building, kitchen, cafeteria, auditorium, and select classrooms. Work is scheduled to finish in August 2027, with construction starting in June 2026 following TDLR plan review completion in February 2026.

The site is located at 8410 Sanger Leandro Drive in Dallas, within Dallas County. The Dallas Independent School District is the owner of record, and RPGA Design Group Inc serves as the design firm. George A Patterson is the registered accessibility specialist for the project. The filing indicates that the project involves public funds, public land, or is a Federally funded roadway project.

Project Scope and Cost

The renovation covers a substantial portion of the school’s operational areas, including the kitchen and cafeteria, which are critical for daily student services. The estimated cost of $9,234,090 results in a cost per square foot of $544. This figure is above the county median of $72 per square foot for renovation and alteration filings in Dallas County. The scheduled build window of 427 days is longer than the county median of 92 days for similar projects.

Context and Comparisons

This project is part of a broader effort by the Dallas Independent School District, which has six other TDLR-registered projects totaling $30,882,178. These include renovations at Lincoln High School and S.S. Conner Elementary School. RPGA Design Group Inc has also worked on two other projects, including First on Seventh in Fort Worth and Children's Lighthouse in Kyle. The site is located in a FEMA Special Flood Hazard Area (zone AE), which may influence construction planning and site work.

According to a solicitation timeline on resources.finalsite.net, the issue date for this project was January 25, 2026. The project is listed on texasbids.net and projects.constructconnect.com under the designation Org 206. The Dallas County unemployment rate in July 2026 was 3.3 percent, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75218 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Alex Sanger Preparatory School- Renovation is a Renovation/Alteration project located at 8410 Sanger Leandro Drive,, Dallas, TX 75218 in Dallas, Texas. The project has an estimated value of $9.2M covering 16,971 sq ft. Dallas Independant School District is the property owner and RPGA Design Group Inc is the design firm of record. The project was registered with TDLR on January 12, 2026.

Frequently Asked Questions

What is the total cost of the renovation?

The estimated cost for the Alex Sanger Preparatory School renovation is $9,234,090.

When will the construction be finished?

The project is scheduled to finish in August 2027, with work starting in June 2026.

Who is the owner of the school?

The Dallas Independent School District is the owner of record for the project.

Is the school in a flood zone?

Yes, the site is inside a FEMA Special Flood Hazard Area (zone AE).

What is Alex Sanger Preparatory School- Renovation?

Alex Sanger Preparatory School- Renovation is a renovation/alteration project at 8410 Sanger Leandro Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to administration, kitchen, cafeteria, auditorium and select classrooms. 16,971sf

Is Alex Sanger Preparatory School- Renovation open in Dallas?

Alex Sanger Preparatory School- Renovation is still under construction in Dallas, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Alex Sanger Preparatory School- Renovation located?

Alex Sanger Preparatory School- Renovation is located at 8410 Sanger Leandro Drive, Dallas, TX, 75218, in Dallas County.

Who is the owner or developer of Alex Sanger Preparatory School- Renovation?

Dallas Independant School District is the property owner/developer of record for Alex Sanger Preparatory School- Renovation, per its TDLR project registration.

Who is the architect or design firm for Alex Sanger Preparatory School- Renovation?

RPGA Design Group Inc is the design firm of record for Alex Sanger Preparatory School- Renovation, according to its TDLR filing.

How much does Alex Sanger Preparatory School- Renovation cost and how big is it?

Alex Sanger Preparatory School- Renovation has an estimated construction value of $9.2M and approximately 16,971 square feet (about $544/sqft), based on its TDLR filing.

Scope of Work

Renovations to administration, kitchen, cafeteria, auditorium and select classrooms. 16,971sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8410 Sanger Leandro Drive, Dallas, TX, 75218

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address