Project intelligenceTDLR TABS2025017473Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lincoln HS phase 2 in Dallas, TX

2826 Elsie Faye Heggins St., Dallas, TX, 75215

Opening ~Jul 2027Review Complete

Lincoln HS phase 2 is a renovation/alteration project at 2826 Elsie Faye Heggins St., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $16.5M across about 41,000 sq ft.

Estimated project value
$16.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
41,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$402/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 24, 2025798 days across supplied datesJul 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    335 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    426 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lincoln HS phase 2

Dallas Independent School District is renovating Lincoln High School at 2826 Elsie Faye Heggins St., Dallas, TX 75215. Filed as Lincoln HS phase 2, this 41,000-square-foot project carries an estimated cost of $16,500,000, or $402 per square foot. The TDLR record shows the work is scheduled to finish in July 2027, with construction starting in May 2026.

The scope involves alterations to the interior and exterior of the main and annex buildings. Corgan Associates serves as the design firm of record, while Ronald L Davis is the registered accessibility specialist. The project involves public funds and is located in Dallas County.

Project Scale and Timeline

TDLR completed plan review in March 2026. The scheduled build window spans 426 days, from the May 2026 start date to the July 2027 completion. This duration is longer than the 92-day median build window for renovation and alteration filings in Dallas County. The estimated cost of $16,500,000 is above the county median of $249,950 for similar projects, placing it in the top quarter of recorded costs.

The per-square-foot cost of $402 is also above the county median of $73. For context, the Dallas Independent School District has six other TDLR-registered projects totaling $23,616,268, including Alex Sanger Preparatory School and S.S. Conner Elementary School. Corgan Associates has six other registered projects totaling $84,215,000, including Barbara Bush Middle School and DFW Airport Terminal F.

Local Context

The project is located in ZIP code 75215, where U.S. Census ACS 2023 estimates indicate a population of about 18,840. The median household income for this area is $41,388, and the median owner-occupied home value is $137,700. Housing in the area is mostly renter-occupied. Dallas County’s unemployment rate was 3 percent in August 2026, lower than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75215 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Lincoln HS phase 2 is a Renovation/Alteration project located at 2826 Elsie Faye Heggins St., Dallas, TX 75215 in Dallas, Texas. The project has an estimated value of $16.5M covering 41,000 sq ft. Dallas Independant School District is the property owner and Corgan Associates is the design firm of record. The project was registered with TDLR on April 24, 2025.

Frequently Asked Questions

Is Lincoln High School renovation open to the public?

The TDLR record tracks construction status, not business operations. The project is scheduled to finish in July 2027, with work starting May 2026. No information is provided regarding public access during the renovation period.

Who is the design firm for Lincoln High School phase 2?

Corgan Associates is the design firm of record for this project. They are also registered for six other TDLR projects, including Barbara Bush Middle School and DFW Airport Terminal F.

What is the estimated cost per square foot?

The estimated cost is $402 per square foot. This figure is above the Dallas County median of $73 for renovation and alteration projects.

When did TDLR complete plan review?

TDLR completed plan review in March 2026. The status is listed as Review Complete, with construction scheduled to start in May 2026.

What is Lincoln HS phase 2?

Lincoln HS phase 2 is a renovation/alteration project at 2826 Elsie Faye Heggins St. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of Lincoln High School under Dallas ISD. Renovation scope involves alterations to the portions of the exterior and interior of the main and annex buildings.

Is Lincoln HS phase 2 open in Dallas?

Lincoln HS phase 2 is still under construction in Dallas, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is Lincoln HS phase 2 located?

Lincoln HS phase 2 is located at 2826 Elsie Faye Heggins St., Dallas, TX, 75215, in Dallas County.

Who is the owner or developer of Lincoln HS phase 2?

Dallas Independant School District is the property owner/developer of record for Lincoln HS phase 2, per its TDLR project registration.

Who is the architect or design firm for Lincoln HS phase 2?

Corgan Associates is the design firm of record for Lincoln HS phase 2, according to its TDLR filing.

How much does Lincoln HS phase 2 cost and how big is it?

Lincoln HS phase 2 has an estimated construction value of $16.5M and approximately 41,000 square feet (about $402/sqft), based on its TDLR filing.

Scope of Work

Renovation of Lincoln High School under Dallas ISD. Renovation scope involves alterations to the portions of the exterior and interior of the main and annex buildings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2826 Elsie Faye Heggins St., Dallas, TX, 75215

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75215 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.