2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School in Rosharon, TX
5151 Savannah Pkwy, Rosharon, TX, 77496
2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School is a renovation/alteration project at 5151 Savannah Pkwy, Rosharon, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $350K across about 1,400 sq ft.
- Estimated project value
- $350K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,400 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $250/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
5 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
126 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
71 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
35 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School
The renovation of the main entry security vestibule at Savannah Lakes Elementary School in Rosharon is complete. Alvin Independent School District finished the project in September 2026, passing its final TDLR accessibility inspection. The work involved upgrading approximately 1,400 square feet of the existing educational facility to enhance security at the primary entrance.
The project, filed as the 2026 P2A Security Vestibule Upgrades, was a renovation and alteration effort with an estimated cost of $350,000. This translates to a cost of $250 per square foot. The scope specifically targeted the main entry vestibule, aiming to improve safety protocols for students and staff within the Brazoria County school district.
Design and Construction Details
JMB2 Architecture, Inc. served as the design firm of record for this initiative. The registered accessibility specialist for the project was Kam-hung Kenneth Woo. The construction timeline was scheduled to begin in May 2026, with a planned completion date of August 2026. The actual final inspection took place in September 2026, confirming the completion of the physical work and adherence to accessibility standards.
This renovation is part of a broader pattern of infrastructure updates by Alvin Independent School District. The district has six other TDLR-registered projects totaling $55,550,000, including significant work at Alvin High School and similar vestibule upgrades at Glenn York, Pomona, Bill Hasse, and Laura Ingalls Wilder Elementary Schools. JMB2 Architecture, Inc. has also been the design firm for five of these other elementary school projects, indicating a standardized approach to security upgrades across the district's facilities.
In comparison to other renovation and alteration filings in Brazoria County, this project's cost is above the county median of $250,000. The scheduled build window of 71 days was shorter than the county median of 95 days. The cost per square foot of $250 is also above the county median of $90, reflecting the specialized nature of security vestibule construction which often requires higher-grade materials and security systems than standard classroom renovations.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77496 (Rosharon)
One email per change. Unsubscribe in one click. Privacy.
2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School is a Renovation/Alteration project located at 5151 Savannah Pkwy, Rosharon, TX 77496 in Rosharon, Texas. The project has an estimated value of $350K covering 1,400 sq ft. Alvin Independent School District is the property owner and JMB2 Architecture, Inc. is the design firm of record. The project was registered with TDLR on January 14, 2026.
Frequently Asked Questions
Is Savannah Lakes Elementary School construction complete?
Yes, the security vestibule renovation is complete. The project passed its final TDLR accessibility inspection in September 2026, confirming that the physical construction work has concluded.
What was the estimated cost of the vestibule upgrade?
The estimated cost for the 1,400-square-foot security vestibule renovation at Savannah Lakes Elementary School was $350,000. This amount covers the alteration of the main entry area to improve security.
Who designed the new security vestibule?
JMB2 Architecture, Inc. was the design firm of record for the project. They also designed similar security vestibule upgrades at five other Alvin ISD elementary schools.
When did the construction start and finish?
Construction was scheduled to start in May 2026. The project was completed and passed its final inspection in September 2026, slightly after the original August 2026 target date.
What is 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School?
2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School is a renovation/alteration project at 5151 Savannah Pkwy in Rosharon, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Main Entry Security Vestibule Renovation Upgrades (approximately 1,400sf per renovation area per school) to Existing Educational Facility to remain.
Is 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School open in Rosharon?
Construction on 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School located?
2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School is located at 5151 Savannah Pkwy, Rosharon, TX, 77496, in Brazoria County.
Who is the owner or developer of 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School?
Alvin Independent School District is the property owner/developer of record for 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School, per its TDLR project registration.
Who is the architect or design firm for 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School?
JMB2 Architecture, Inc. is the design firm of record for 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School, according to its TDLR filing.
How much does 2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School cost and how big is it?
2026 P2A Security Vestibule Upgrades - Savannah Lakes Elementry School has an estimated construction value of $350K and approximately 1,400 square feet (about $250/sqft), based on its TDLR filing.
Scope of Work
Main Entry Security Vestibule Renovation Upgrades (approximately 1,400sf per renovation area per school) to Existing Educational Facility to remain.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5151 Savannah Pkwy, Rosharon, TX, 77496
Related Projects
Same Owner
$54.9M totalWatch all construction in 77496 (Rosharon)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rosharon?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.