Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES
802 S Johnson St., Alvin, TX, 77511
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES is a renovation/alteration project at 802 S Johnson St., Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $53.8M across about 93,341 sq ft.
- Estimated project value
- $53.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 93,341 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $576/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
134 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
516 days after the preceding date shown.
Source: TDLR filing
View source record
📰About ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES
Alvin High School Renovations and Upgrades is a $53,800,000 construction project located at 802 S Johnson St. in Alvin, Texas. The project involves the construction of new academic and administrative facilities as well as significant site improvements within Brazoria County. The total scope covers 93,341 square feet of new and expanded space, representing a major capital investment for the Alvin Independent School District.
The primary components of the build include a new 19,597-square-foot entry building and a 71,939-square-foot Career and Technical Education (CTE) building. Both structures will contain academic instruction areas and administrative offices. Additionally, the existing cafeteria will undergo a 1,805-square-foot expansion to increase capacity. Site work includes the creation of a new visitor parking area and a dedicated drop-off zone to improve traffic flow around the campus.
Project Status and Timeline
The project was registered with TDLR in March 2026. Construction is scheduled to begin in July 2026, with the entire project targeted for December 2027. This scheduled build window spans 516 days, which is longer than the 95-day median for similar renovation and alteration filings in Brazoria County. The estimated cost per square foot is $576, a figure that sits above the county median of $90 for this project type.
William T Winning is the registered accessibility specialist associated with this filing. The project utilizes public funds and involves public land. Alvin Independent School District holds six other TDLR-registered projects, including renovations at Savannah Lakes, Glenn York, Pomona, Bill Hasse, and Laura Ingalls Wilder elementary schools, each with an estimated cost of $350,000. Those projects have completed inspections, while this high school project remains in the registration phase.
The Alvin Independent School District website describes the Alvin High School renovations as part of a broader bond proposal to remove older temporary buildings and upgrade the campus, which was established in 1894. The surrounding area includes local landmarks such as Alvin Memorial Stadium and Lions Park, as well as community services like the Alvin Community Food Pantry. Census estimates for the 77511 ZIP code indicate a population of approximately 51,984 residents and a median household income of $77,015.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77511 (Alvin)
One email per change. Unsubscribe in one click. Privacy.
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES is a Renovation/Alteration project located at 802 S Johnson St., Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $53.8M covering 93,341 sq ft. Alvin Independent School District is the property owner. The project was registered with TDLR on March 10, 2026.
Frequently Asked Questions
When is the Alvin High School renovation expected to be finished?
The project is targeted for December 2027. Construction is scheduled to start in July 2026, following the March 2026 TDLR registration.
What is the total square footage of the new buildings?
The total scope covers 93,341 square feet. This includes a 19,597-square-foot entry building, a 71,939-square-foot CTE building, and a 1,805-square-foot cafeteria expansion.
Who is the owner of this construction project?
The owner of record is the Alvin Independent School District. William T Winning is the registered accessibility specialist for the project.
Is the Alvin High School renovation currently open to the public?
The project is in the construction phase and is targeted for December 2027 completion. It is not open as a finished facility.
What is ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES?
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES is a renovation/alteration project at 802 S Johnson St. in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 19,597SF Alvin High School entry building New 71,939 CTE building both with academic instruction areas and administrative offices. 1,805SF expansion of the existing cafeteria. Site Improvements - visitor parking area & drop off.
Is ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES open in Alvin?
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES is still under construction in Alvin, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES located?
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES is located at 802 S Johnson St., Alvin, TX, 77511, in Brazoria County.
Who is the owner or developer of ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES?
Alvin Independent School District is the property owner/developer of record for ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES, per its TDLR project registration.
How much does ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES cost and how big is it?
ALVIN HIGH SCHOOL RENOVATIONS AND UPGRADES has an estimated construction value of $53.8M and approximately 93,341 square feet (about $576/sqft), based on its TDLR filing.
Scope of Work
New 19,597SF Alvin High School entry building New 71,939 CTE building both with academic instruction areas and administrative offices. 1,805SF expansion of the existing cafeteria. Site Improvements - visitor parking area & drop off.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
802 S Johnson St., Alvin, TX, 77511
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 77511 (Alvin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Alvin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.