OC Taylor ES Renovation in Colleyville, TX

5300 Pool Rd, Colleyville, TX, 76034

Construction complete · Aug 2026Inspection Complete

OC Taylor ES Renovation is a renovation/alteration project at 5300 Pool Rd, Colleyville, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $648K across about 3,900 sq ft.

Estimated project value
$648K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,900 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$166/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 27, 2026198 days across supplied datesAug 13, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    71 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    68 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About OC Taylor ES Renovation

OC Taylor Elementary in Colleyville has completed its renovation work. The project, filed with the Texas Department of Licensing and Regulation (TDLR) as OC Taylor ES Renovation, passed its final TDLR accessibility inspection in August 2026. This confirms that construction is complete for the 3,900 sq ft facility located at 5300 Pool Rd, Colleyville, TX 76034.

The renovation was executed by Grapevine-Colleyville ISD, the owner of record. Huckabee served as the design firm for this alteration project. The total estimated cost for the work was $647,835, which calculates to $166 per square foot. This cost per square foot is above the Tarrant County median of $79 for similar renovation filings, and the total project cost sits in the top quarter of the county’s median range for this work type.

Project Timeline and Scope

The project timeline was concise relative to county averages. Construction began in May 2026 following plan review completion in April 2026. The scheduled build window was 68 days, which is shorter than the Tarrant County median of 92 days for renovation and alteration projects. The final inspection passed in August 2026, matching the completion date listed on the filing. The scope of work was defined as renovation and alteration, involving public funds and public land.

Grapevine-Colleyville ISD is the owner of several other TDLR-registered projects in the region. These include renovations at Timberline Elementary in Grapevine and the Colleyville Heritage High School. The district’s portfolio includes other significant construction efforts, such as the Grapevine High School renovation valued at $16,603,274 and the Swim Center renovations in Grapevine. Huckabee, the design firm for OC Taylor Elementary, has also worked on other projects, including the Venus High School project valued at $63,800,000 and the Killeen ISD learning center renovation.

The Colleyville area where OC Taylor Elementary is located has a median household income of $203,157 according to U.S. Census estimates for ZIP code 76034. The median owner-occupied home value in this area is $717,600. The project’s completion adds to the district’s ongoing investment in school infrastructure within Tarrant County, where the unemployment rate was 4.6 percent in July 2026.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76034 (Colleyville)

One email per change. Unsubscribe in one click. Privacy.

OC Taylor ES Renovation is a Renovation/Alteration project located at 5300 Pool Rd, Colleyville, TX 76034 in Colleyville, Texas. The project has an estimated value of $648K covering 3,900 sq ft. Grapevine-Colleyville ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on January 27, 2026.

Frequently Asked Questions

Is OC Taylor Elementary finished?

Yes, the renovation is complete. The project passed its final TDLR accessibility inspection in August 2026, confirming that construction has ended.

Who built the OC Taylor Elementary renovation?

Grapevine-Colleyville ISD is the owner of record. Huckabee was the design firm, and Ross A Thomas was the registered accessibility specialist.

How much did the renovation cost?

The estimated cost was $647,835. This equates to $166 per square foot for the 3,900 sq ft project.

Where is OC Taylor Elementary located?

The school is located at 5300 Pool Rd, Colleyville, TX 76034, in Tarrant County.

When did construction start and end?

Construction started in May 2026 and the final inspection passed in August 2026.

What is OC Taylor ES Renovation?

OC Taylor ES Renovation is a renovation/alteration project at 5300 Pool Rd in Colleyville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation

Is OC Taylor ES Renovation open in Colleyville?

Construction on OC Taylor ES Renovation is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is OC Taylor ES Renovation located?

OC Taylor ES Renovation is located at 5300 Pool Rd, Colleyville, TX, 76034, in Tarrant County.

Who is the owner or developer of OC Taylor ES Renovation?

Grapevine-Colleyville ISD is the property owner/developer of record for OC Taylor ES Renovation, per its TDLR project registration.

Who is the architect or design firm for OC Taylor ES Renovation?

Huckabee is the design firm of record for OC Taylor ES Renovation, according to its TDLR filing.

How much does OC Taylor ES Renovation cost and how big is it?

OC Taylor ES Renovation has an estimated construction value of $648K and approximately 3,900 square feet (about $166/sqft), based on its TDLR filing.

Scope of Work

Renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5300 Pool Rd, Colleyville, TX, 76034

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76034 (Colleyville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Colleyville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.