Grapevine HS Reno
3223 Mustang Dr, Grapevine, TX, 76051
Grapevine HS Reno is a renovation/alteration project at 3223 Mustang Dr, Grapevine, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $16.6M across about 340,485 sq ft.
- Estimated project value
- $16.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 340,485 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $49/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
77 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
413 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Grapevine HS Reno
Grapevine High School, located at 3223 Mustang Dr in Grapevine, is undergoing a major renovation project filed with the Texas Department of Licensing and Regulatory Affairs. The scope of work is a renovation/alteration of the 340,485 sq ft facility, with an estimated cost of $16,603,274. The project is registered under the name Grapevine HS Reno and is owned by Grapevine-Colleyville ISD.
TDLR completed plan review in April 2026 and construction is scheduled to finish in July 2027, with work starting May 2026. The project’s status is marked as Review Complete. This timeline indicates a substantial build window of 413 days, which is longer than the 92-day median for similar renovation projects in Tarrant County.
Project Details and Context
The estimated cost per square foot for this renovation is $49, which is below the county median of $79 for comparable work. However, the total estimated cost of $16,603,274 places the project in the top quarter of Tarrant County renovation filings, well above the median of $250,000. The design firm of record is Huckabee, and the registered accessibility specialist is Ross A Thomas.
Grapevine-Colleyville ISD has six other TDLR-registered projects totaling $22,151,147, including renovations at Timberline Elementary and OC Taylor Elementary. Huckabee has designed six other projects totaling $81,231,000, including Venus High School and Midway HS Athletics Addition. The project involves public funds and public land, aligning with its status as a Federally funded roadway project or public infrastructure initiative.
Surrounding the site are several local businesses, including Public Storage, Starbucks Coffee Company, Vision Hair Salon, Pride Academy & Preschool, 7-Eleven, and Subway. The area profile for ZIP 76051 shows a population of about 50,514, a median household income of $111,193, and a median owner-occupied home value of $467,800. Tarrant County’s unemployment rate was 4.6 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76051 (Grapevine)
One email per change. Unsubscribe in one click. Privacy.
Grapevine HS Reno is a Renovation/Alteration project located at 3223 Mustang Dr, Grapevine, TX 76051 in Grapevine, Texas. The project has an estimated value of $16.6M covering 340,485 sq ft. Grapevine-Colleyville ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on January 27, 2026.
Frequently Asked Questions
What is the estimated cost of the Grapevine High School renovation?
The estimated cost for the Grapevine High School renovation is $16,603,274, which is above the county median for similar projects.
When is the construction scheduled to finish?
Construction is scheduled to finish in July 2027, with work starting in May 2026.
Who is the design firm for this project?
Huckabee is the design firm of record for the Grapevine High School renovation project.
Is the project currently open to the public?
The project is under renovation and not open to the public; construction is scheduled to finish in July 2027.
What is the square footage of the renovation?
The renovation covers 340,485 sq ft of the Grapevine High School facility.
What is Grapevine HS Reno?
Grapevine HS Reno is a renovation/alteration project at 3223 Mustang Dr in Grapevine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation
Is Grapevine HS Reno open in Grapevine?
Grapevine HS Reno is still under construction in Grapevine, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is Grapevine HS Reno located?
Grapevine HS Reno is located at 3223 Mustang Dr, Grapevine, TX, 76051, in Tarrant County.
Who is the owner or developer of Grapevine HS Reno?
Grapevine-Colleyville ISD is the property owner/developer of record for Grapevine HS Reno, per its TDLR project registration.
Who is the architect or design firm for Grapevine HS Reno?
Huckabee is the design firm of record for Grapevine HS Reno, according to its TDLR filing.
How much does Grapevine HS Reno cost and how big is it?
Grapevine HS Reno has an estimated construction value of $16.6M and approximately 340,485 square feet (about $49/sqft), based on its TDLR filing.
Scope of Work
renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3223 Mustang Dr, Grapevine, TX, 76051
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$24.1M totalWatch all construction in 76051 (Grapevine)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Grapevine?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.