TNMP 2025 Addition in Alvin, TX
2641 E Hwy 6, Alvin, TX, 77511
TNMP 2025 Addition is a additions to existing building project at 2641 E Hwy 6, Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $2.5M across about 13,150 sq ft.
- Estimated project value
- $2.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,150 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $190/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
21 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
26 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
244 days after the preceding date shown.
Source: TDLR filing
View source record
📰About TNMP 2025 Addition
Tnmp Asoc is expanding its office facility at 2641 E Hwy 6 in Alvin, adding 13,150 sq ft to the existing 15,318 sq ft structure. The project, registered as TNMP 2025 Addition, involves substantial construction work including new east and west wings and interior renovations.
The scope of work includes constructing a 4,257 sq ft East addition and a 4,528 sq ft West addition. Approximately 4,362 sq ft of the existing building will be renovated to integrate with the new spaces. Site improvements are also part of the plan, specifically the rework of paving and parking areas to accommodate the increased footprint.
Project Status and Timeline
TDLR completed plan review in March 2026 and construction is scheduled to finish in December 2026, with work starting April 2026. The estimated cost for this privately funded project is $2,500,000. This figure places the project in the top quarter of estimated costs for similar additions in Brazoria County, where the median is $487,500.
Genesis Design Group, Inc. serves as the design firm of record. Michael J Love is the registered accessibility specialist for the project. The construction window spans 244 days, which is longer than the county median of 184 days for comparable filings. The cost per square foot is $190, exceeding the county median of $130 per square foot.
The facility is located in Brazoria County, within ZIP code 77511. Census estimates for this area indicate a population of about 51,984 and a median household income of $77,015. The housing stock in the area is mostly owner-occupied, with a median home value of $218,100. This expansion adds to the commercial infrastructure in a region with a median housing unit count of 20,499.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77511 (Alvin)
One email per change. Unsubscribe in one click. Privacy.
TNMP 2025 Addition is a Additions to Existing Building project located at 2641 E Hwy 6, Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $2.5M covering 13,150 sq ft. Texas New Mexico Power CO is the property owner and Genesis Design Group, Inc. is the design firm of record. The project was registered with TDLR on February 13, 2026.
Frequently Asked Questions
Who is the owner of the project?
The owner of record is Texas New Mexico Power CO. The project is privately funded and located on private land for private use.
When is the construction expected to be complete?
Construction is scheduled to finish in December 2026. Work is set to begin in April 2026, following the completion of plan review in March 2026.
Is the business currently open?
The TDLR record reflects construction status only. It does not confirm whether the business is open or operating. The status indicates construction is scheduled to finish in December 2026.
What is TNMP 2025 Addition?
TNMP 2025 Addition is a additions to existing building project at 2641 E Hwy 6 in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing office building is 15,318 sf. We are adding an East addition of 4257 sf and a West addition of 4,528 sf and renovating approx 4,362 of the existing building. Rework of site paving and parking as required for the additions.
Is TNMP 2025 Addition open in Alvin?
TNMP 2025 Addition is still under construction in Alvin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is TNMP 2025 Addition located?
TNMP 2025 Addition is located at 2641 E Hwy 6, Alvin, TX, 77511, in Brazoria County.
Who is the owner or developer of TNMP 2025 Addition?
Texas New Mexico Power CO is the property owner/developer of record for TNMP 2025 Addition, per its TDLR project registration.
Who is the architect or design firm for TNMP 2025 Addition?
Genesis Design Group, Inc. is the design firm of record for TNMP 2025 Addition, according to its TDLR filing.
How much does TNMP 2025 Addition cost and how big is it?
TNMP 2025 Addition has an estimated construction value of $2.5M and approximately 13,150 square feet (about $190/sqft), based on its TDLR filing.
Scope of Work
Existing office building is 15,318 sf. We are adding an East addition of 4257 sf and a West addition of 4,528 sf and renovating approx 4,362 of the existing building. Rework of site paving and parking as required for the additions.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2641 E Hwy 6, Alvin, TX, 77511
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77511 (Alvin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Alvin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.