Project intelligenceTDLR TABS2026012626Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road)

Allen Ave and Arbrook Boulevard, Arlington, TX, 76014

Target date passed (Aug 2026)Review Complete

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) is a renovation/alteration project at Allen Ave and Arbrook Boulevard, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $300K across about 1,500 sq ft.

Estimated project value
$300K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$200/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 13, 2026199 days across supplied datesAug 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    16 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    141 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76014 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) is a Renovation/Alteration project located at Allen Ave and Arbrook Boulevard, Arlington, TX 76014 in Arlington, Texas. The project has an estimated value of $300K covering 1,500 sq ft. City of Arlington is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on February 13, 2026.

Frequently Asked Questions

What is Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road)?

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) is a renovation/alteration project at Allen Ave and Arbrook Boulevard in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install new sidewalk along Allen Avenue between Arbrook boulevard to Mayfield Road.

Is Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) open in Arlington?

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) located?

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) is located at Allen Ave and Arbrook Boulevard, Arlington, TX, 76014, in Tarrant County.

Who is the owner or developer of Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road)?

City of Arlington is the property owner/developer of record for Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road), per its TDLR project registration.

Who is the architect or design firm for Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road)?

Kimley-Horn is the design firm of record for Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road), according to its TDLR filing.

How much does Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) cost and how big is it?

Allen Avenue Sidewalk (Arbrook Boulevard to Mayfield Road) has an estimated construction value of $300K and approximately 1,500 square feet (about $200/sqft), based on its TDLR filing.

Scope of Work

Install new sidewalk along Allen Avenue between Arbrook boulevard to Mayfield Road.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Allen Ave and Arbrook Boulevard, Arlington, TX, 76014

Location by street address

Watch all construction in 76014 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Arlington?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.