Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
2026 Asphalt Resurfacing Contract 3 in Fort Worth, TX
Acapulco Rd, Beckwood Rd, Bermejo Rd, Fort Worth, TX, 76112
2026 Asphalt Resurfacing Contract 3 is a renovation/alteration project at Acapulco Rd, Beckwood Rd, Bermejo Rd, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $120K across about 12,000 sq ft.
- Estimated project value
- $120K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 12,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $10/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
4 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
22 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
170 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About 2026 Asphalt Resurfacing Contract 3
The 2026 Asphalt Resurfacing Contract 3 in Fort Worth is complete. This project involved the asphalt resurfacing of select streets in the Sundance Square area, specifically along Acapulco Rd, Beckwood Rd, and Bermejo Rd. The work included the installation of new curb ramps and the replacement of damaged sidewalks to improve pedestrian access.
The City of Fort Worth served as the owner of record for this renovation and alteration project. The total estimated cost was $120,000 for 12,000 square feet of work, resulting in a cost of $10 per square foot. This figure is below the county median for similar renovation and alteration filings in Tarrant County, which stands at $79 per square foot.
Construction Timeline and Status
The project registered with the Texas Department of Licensing and Regulation in February 2026. Plan review was completed in March 2026. Construction began in February 2026, and the scheduled build window was 192 days, which is longer than the county median of 92 days for this type of work.
The final TDLR accessibility inspection passed in September 2026. This confirms that the construction is complete and the project meets the required accessibility standards. The project utilized public funds and is located on public land in Tarrant County.
George A Patterson acted as the registered accessibility specialist for this filing. The site is located in a dense urban area near major landmarks such as Sundance Square, Bass Performance Hall, and several hotels including The Worthington Renaissance Fort Worth Hotel and Hilton Fort Worth. The nearby population in ZIP code 76112 is approximately 44,116, with a median household income of $53,335 according to U.S. Census estimates.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76112 (Fort Worth)
One email per change. Unsubscribe in one click. Privacy.
2026 Asphalt Resurfacing Contract 3 is a Renovation/Alteration project located at Acapulco Rd, Beckwood Rd, Bermejo Rd, Fort Worth, TX 76112 in Fort Worth, Texas. The project has an estimated value of $120K covering 12,000 sq ft. City of Fort Worth is the property owner. The project was registered with TDLR on February 19, 2026.
Frequently Asked Questions
Is the asphalt resurfacing project in Fort Worth finished?
Yes, construction is complete. The project passed its final TDLR accessibility inspection in September 2026, confirming that all work on the streets and sidewalks is done.
Which specific streets were resurfaced?
The work covered Acapulco Rd, Beckwood Rd, and Bermejo Rd in the Sundance Square area of Fort Worth, including curb ramps and sidewalk replacements.
Who owned this project?
The City of Fort Worth was the owner of record for this asphalt resurfacing contract, which utilized public funds.
How much did the project cost?
The estimated cost was $120,000 for 12,000 square feet of work, which equates to $10 per square foot.
When did construction start and end?
Construction started in February 2026 and the final inspection was passed in September 2026.
What is 2026 Asphalt Resurfacing Contract 3?
2026 Asphalt Resurfacing Contract 3 is a renovation/alteration project at Acapulco Rd, Beckwood Rd, Bermejo Rd in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Asphalt resurfacing of select streets, including curb ramps and damaged sidewalk replacement.
Is 2026 Asphalt Resurfacing Contract 3 open in Fort Worth?
Construction on 2026 Asphalt Resurfacing Contract 3 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is 2026 Asphalt Resurfacing Contract 3 located?
2026 Asphalt Resurfacing Contract 3 is located at Acapulco Rd, Beckwood Rd, Bermejo Rd, Fort Worth, TX, 76112, in Tarrant County.
Who is the owner or developer of 2026 Asphalt Resurfacing Contract 3?
City of Fort Worth is the property owner/developer of record for 2026 Asphalt Resurfacing Contract 3, per its TDLR project registration.
How much does 2026 Asphalt Resurfacing Contract 3 cost and how big is it?
2026 Asphalt Resurfacing Contract 3 has an estimated construction value of $120K and approximately 12,000 square feet (about $10/sqft), based on its TDLR filing.
Scope of Work
Asphalt resurfacing of select streets, including curb ramps and damaged sidewalk replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Acapulco Rd, Beckwood Rd, Bermejo Rd, Fort Worth, TX, 76112
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 76112 (Fort Worth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Fort Worth?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.