Project intelligenceTDLR TABS2026013425Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Ciao & Go

2040 S. International Pkwy., Dfw Airport, TX, 75261

Target date passed (Sep 2026)Review Complete

Ciao & Go is a renovation/alteration project at 2040 S. International Pkwy., Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $430K across about 431 sq ft.

Estimated project value
$430K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
431 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$998/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 24, 2026189 days across supplied datesSep 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    161 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Ciao & Go

Ciao & Go is a tenant build-out for a grab-and-go food retail location at 2040 S. International Pkwy. in Dfw Airport, Tarrant County. The project, registered under the name DFW Airport -4, 5, 3, 16, involves the renovation and alteration of space A-2-038P-A01 within the new A terminal. The finished space will feature coolers and shelving stocked with food products, serving travelers in a dedicated retail area.

The project scope covers 431 square feet of interior work. The estimated cost for this renovation is $430,000, which calculates to $998 per square foot. This cost per square foot is above the county median of $79 for similar renovation and alteration filings. The total estimated cost is also above the Tarrant County median of $250,000 for this type of work.

Project Details and Design

The City of Dallas is the owner of record for this project. The design firm of record is Hobbs+Black, which has other TDLR-registered projects in the Dfw Airport area. Monica J Harris is the registered accessibility specialist for the filing. The project is privately funded on private land for private use, despite the municipal ownership of record.

TDLR completed plan review in March 2026. Construction was scheduled to begin in March 2026 and finish in September 2026. This scheduled build window of 184 days is longer than the county median of 92 days for similar projects. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record.

Other registered projects in the same area include DFW Terminal D and E, Sfw4, Terminal B, Terminal A DFW Airport, and DFW Airport T-A. The City of Dallas has six other TDLR-registered projects totaling $41,374,257, including the Dallas ZOO and Sfw4. Hobbs+Black has two other TDLR-registered projects totaling $2,182,000 in the Dfw Airport area.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dfw Airport)

One email per change. Unsubscribe in one click. Privacy.

Ciao & Go is a Renovation/Alteration project located at 2040 S. International Pkwy., Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $430K covering 431 sq ft. CITY OF DALLAS is the property owner and Hobbs+Black is the design firm of record. The project was registered with TDLR on February 24, 2026.

Frequently Asked Questions

Is Ciao & Go open for business?

The TDLR record shows the project has not yet recorded a final inspection. There is no public confirmation in the available facts that the business is open or operating.

What is the address of this project?

The project is located at 2040 S. International Pkwy., Dfw Airport, TX 75261, within Tarrant County.

Who is the design firm for this renovation?

Hobbs+Black is the design firm of record for this specific renovation project.

What is Ciao & Go?

Ciao & Go is a renovation/alteration project at 2040 S. International Pkwy. in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ciao & Go is a tenant build out of location A-2-038P-A01 with in the new A terminal. The build out is a grab and go location consisting of coolers and shelving retailing food products.

Is Ciao & Go open in Dfw Airport?

Ciao & Go was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Ciao & Go located?

Ciao & Go is located at 2040 S. International Pkwy., Dfw Airport, TX, 75261, in Tarrant County.

Who is the owner or developer of Ciao & Go?

CITY OF DALLAS is the property owner/developer of record for Ciao & Go, per its TDLR project registration.

Who is the architect or design firm for Ciao & Go?

Hobbs+Black is the design firm of record for Ciao & Go, according to its TDLR filing.

How much does Ciao & Go cost and how big is it?

Ciao & Go has an estimated construction value of $430K and approximately 431 square feet (about $998/sqft), based on its TDLR filing.

Scope of Work

Ciao & Go is a tenant build out of location A-2-038P-A01 with in the new A terminal. The build out is a grab and go location consisting of coolers and shelving retailing food products.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2040 S. International Pkwy., Dfw Airport, TX, 75261

Location by street address

Watch all construction in 75261 (Dfw Airport)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dfw Airport?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.