Water and Sanitary Sewer Replacement WSM-I: Part 1

Carnation Ave. intersection at N. Sylvania Ave. an, Fort Worth, TX, 76111

Opening ~Aug 2027Review Complete

Water and Sanitary Sewer Replacement WSM-I: Part 1 is a renovation/alteration project at Carnation Ave. intersection at N. Sylvania Ave. an, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $195K across about 3,578 sq ft.

Estimated project value
$195K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,578 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$54/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 6, 2026543 days across supplied datesAug 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    80 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    437 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76111 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Water and Sanitary Sewer Replacement WSM-I: Part 1 is a Renovation/Alteration project located at Carnation Ave. intersection at N. Sylvania Ave. an, Fort Worth, TX 76111 in Fort Worth, Texas. The project has an estimated value of $195K covering 3,578 sq ft. City of Fort Worth is the property owner and Kimley-Horn and Associates, Inc is the design firm of record. The project was registered with TDLR on March 6, 2026.

Frequently Asked Questions

What is Water and Sanitary Sewer Replacement WSM-I: Part 1?

Water and Sanitary Sewer Replacement WSM-I: Part 1 is a renovation/alteration project at Carnation Ave. intersection at N. Sylvania Ave. an in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SF: Sidewalks:3,578, Barrier Free Ramps:32, Scope: Water replacements, sanitary sewer replacements, road rehabilitation

Is Water and Sanitary Sewer Replacement WSM-I: Part 1 open in Fort Worth?

Water and Sanitary Sewer Replacement WSM-I: Part 1 is still under construction in Fort Worth, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Water and Sanitary Sewer Replacement WSM-I: Part 1 located?

Water and Sanitary Sewer Replacement WSM-I: Part 1 is located at Carnation Ave. intersection at N. Sylvania Ave. an, Fort Worth, TX, 76111, in Tarrant County.

Who is the owner or developer of Water and Sanitary Sewer Replacement WSM-I: Part 1?

City of Fort Worth is the property owner/developer of record for Water and Sanitary Sewer Replacement WSM-I: Part 1, per its TDLR project registration.

Who is the architect or design firm for Water and Sanitary Sewer Replacement WSM-I: Part 1?

Kimley-Horn and Associates, Inc is the design firm of record for Water and Sanitary Sewer Replacement WSM-I: Part 1, according to its TDLR filing.

How much does Water and Sanitary Sewer Replacement WSM-I: Part 1 cost and how big is it?

Water and Sanitary Sewer Replacement WSM-I: Part 1 has an estimated construction value of $195K and approximately 3,578 square feet (about $54/sqft), based on its TDLR filing.

Scope of Work

SF: Sidewalks:3,578, Barrier Free Ramps:32, Scope: Water replacements, sanitary sewer replacements, road rehabilitation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Carnation Ave. intersection at N. Sylvania Ave. an, Fort Worth, TX, 76111

Location by street address

Watch all construction in 76111 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.