Project Pumpkin 3A
Project Pumpkin 3A is a new construction project at 8850 Co. Rd. 21, Miami, in Gray County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2028. The project has an estimated value of $400.0M across about 761,000 sq ft.
๐Project Metrics
TDLR #TABS2026014835Project Registered
Project has been registered with TDLR and is in pre-construction phase
Project Pumpkin 3A is a New Construction project located at 8850 Co. Rd. 21, Miami, TX 79059 in Miami, Texas. The project has an estimated value of $400.0M covering 761,000 sq ft. IP Meitner Land LLC is the property owner and HDR Engineering Inc. is the design firm of record. The project was registered with TDLR on March 12, 2026.
โFrequently Asked Questions
What is Project Pumpkin 3A?
Project Pumpkin 3A is a new construction project at 8850 Co. Rd. 21 in Miami, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1-story data center with associated central utility buildings
Is Project Pumpkin 3A open in Miami?
Project Pumpkin 3A is still under construction in Miami, TX, with an estimated completion of Apr 2028 according to its TDLR registration.
Where is Project Pumpkin 3A located?
Project Pumpkin 3A is located at 8850 Co. Rd. 21, Miami, TX, 79059, in Gray County.
Who is the owner or developer of Project Pumpkin 3A?
IP Meitner Land LLC is the property owner/developer of record for Project Pumpkin 3A, per its TDLR project registration.
Who is the architect or design firm for Project Pumpkin 3A?
HDR Engineering Inc. is the design firm of record for Project Pumpkin 3A, according to its TDLR filing.
How much does Project Pumpkin 3A cost and how big is it?
Project Pumpkin 3A has an estimated construction value of $400.0M and approximately 761,000 square feet (about $526/sqft), based on its TDLR filing.
๐Scope of Work
1-story data center with associated central utility buildings
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 12, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.20B total๐๏ธSame Design Firm
$1.20B totalProperty Owner
Design Firm
Registered Accessibility Specialist