Miami, TX Construction Projects

What's being built in Miami6 projects on file from Texas public records

6
Total Projects
$1.20B
Total Investment
3
New Construction
3
Renovations
2.3M
Total Sq Ft
$200.6M
Avg. Value

What is being built in Miami, Texas?

Miami, Texas has 6 construction and development projects on file worth $1.20B — 3 new construction and 3 renovations or remodels. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Miami?

The most recently filed new-construction projects in Miami are Project Pumpkin 1A ($400.0M), Project Pumpkin 3A ($400.0M), Project Pumpkin 2A ($400.0M). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 6 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Miami
Estimated construction value$1.2BSum of 6 shown records with value
Records in view6 / 6Ready to inspect and compare
Largest record’s share33.2%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value · Smaller records grouped
Miami

Comparisons use only these 6 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Miami, Texas

Miami is experiencing significant construction and development activity with 6 registered projects valued at $1.20B. The city's development portfolio includes 3 new construction projects and 3 renovation projects, representing 2,283,000 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 3 new construction projects (50%)
  • 3 renovation/remodel projects (50%)
  • Average project value: $200.6M

Key Players

Miami's construction market features 4 major property owners and 4 active design firms driving development across the city.

Leading developers include IP Meitner Land LLC and ROBERTS COUNTY, working with architecture firms such as HDR Engineering Inc. and PRESERVATION ASSOCIATES.

Our database tracks all TDLR-registered construction projects in Miami. Projects span Gray and Roberts counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Miami and the surrounding area.

All Projects

6 TDLR · 0 Site Plans

Showing 6 of 6 listed TDLR filings

Review Complete
$400.0M

Project Pumpkin 1A

8810 Co. Rd. 21, Miami, TX 79059

761,000 sqftMar 12, 2026
Registered
$400.0M

Project Pumpkin 3A

8850 Co. Rd. 21, Miami, TX 79059

761,000 sqftMar 12, 2026

Miami construction questions

How many construction projects are there in Miami, Texas?
There are 6 registered construction projects in Miami, Texas with a total estimated value of $1.20B and 2,283,000 square feet of development. The average project is valued at $200.6M.
What kind of construction is happening in Miami?
Miami has 3 new construction projects (50%) and 3 renovation or remodel projects (50%) on file, together totaling 2,283,000 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Miami?
The most active property owners on file in Miami are IP Meitner Land LLC, ROBERTS COUNTY, UNITED METHODIST CHURCH. The architecture and design firms appearing most often on Miami filings are HDR Engineering Inc., PRESERVATION ASSOCIATES, OPEN RANGE ENGINEERING SERVICES PLLC.
Where does this Miami construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Miami filings themselves and change as new records are registered. How Zabalist sources Texas construction records.