Property Owner1 not closed in shown records

UNITED METHODIST CHURCH

ANGELA M. BRANCH 2200 LAKE WOODLANDS DRIVE, THE WOODLANDS, TX 77380

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$6.7M
Portfolio Value
1
Not closed · shown
—
Sq ft · shown
2
Cities · shown
$3.4M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time UNITED METHODIST CHURCH files a new project.

Export full work history

Download UNITED METHODIST CHURCH's complete project record — and companies like it — as a CSV.

Browse data lists
Related to UNITED METHODIST CHURCH

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About UNITED METHODIST CHURCH

UNITED METHODIST CHURCH is named as an owner in 2 construction filings in Houston and Roberts County, with a reported portfolio value of $6.7M. The 2 loaded filings include 1 new construction records and 1 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (50%)
  • 1 renovation projects (50%)
  • Average disclosed value in shown filings: $3.4M
  • Square footage in shown records: — sq ft

Market Presence

  • Montgomery1 projects
  • Miami1 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 2 cities and name design firms including GENSLER, OPEN RANGE ENGINEERING SERVICES PLLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2011
1
2018
1
Median project: $6.5MPeak year: 2011 (1 projects)

Activity Timeline

First Project
Oct 2011
Latest Project
Jun 2018
1
Not closed
1
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$6.7M combined

Project Status

Inspection Complete
1(50%)
Closed
1(50%)