Project intelligenceTDLR TABS2026015168New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Post WWTP

105 E. Main Street, Post, TX, 79356

Opening ~Oct 2027Project Registered

City of Post WWTP is a new construction project at 105 E. Main Street, Post, in Garza County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $12.0M across about 3,531 sq ft.

Estimated project value
$12.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,531 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.40K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 17, 2026591 days across supplied datesOct 29, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    104 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    487 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About City of Post WWTP

The City of Post is constructing a new mechanical wastewater treatment plant at 105 E. Main Street in Post, Texas. This new construction project, filed under the name City of Post WWTP, covers a site of 3,531 square feet. The estimated cost for this infrastructure upgrade is $12,000,000, a figure that places it well above the median cost for similar new construction filings in Garza County.

Scope and Design

The facility is designed by Parkhill, with Jorge Campos listed as the design firm of record. The scope of work includes a lift station, screening systems, aeration basins, and clarifiers. It also encompasses a phosphorus removal system, disinfection equipment, sludge dewatering equipment, discharge structures, and an administrative building. Stephen D Macphie serves as the registered accessibility specialist for this project, which was registered with TDLR in March 2026.

Plan review is pending, and the construction start date is set for June 2026. The completion date on the filing is targeted for October 2027. This scheduled build window of 487 days is longer than the county median of 228 days for new construction projects. The project involves public funds and public land, reflecting the City of Post's investment in local infrastructure.

The cost per square foot for this project is $3,398, which is above the county median of $196 per square foot. This disparity reflects the complex mechanical and engineering requirements of a wastewater treatment facility compared to standard commercial buildings. The City of Post has two other TDLR-registered projects totaling $635,000, including the Post Splash Pad and another project, both of which are closed.

Post is a small community in Garza County with a population of about 5,362 according to U.S. Census estimates for ZIP code 79356. The median household income in the area is $48,466, and the median owner-occupied home value is $83,100. Local businesses near the site include Dollar General, Higginbotham Brothers, Hometown Pharmacy, the Post Public Library, and the Post Dispatch. The Garza County unemployment rate was 5.4 percent in July 2026, higher than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79356 (Post)

One email per change. Unsubscribe in one click. Privacy.

City of Post WWTP is a New Construction project located at 105 E. Main Street, Post, TX 79356 in Post, Texas. The project has an estimated value of $12.0M covering 3,531 sq ft. City of Post is the property owner and Parkhill (Jorge Campos)as is the design firm of record. The project was registered with TDLR on March 17, 2026.

Frequently Asked Questions

What is the total estimated cost of the Post WWTP project?

The estimated cost for the new wastewater treatment plant construction is listed as $12,000,000 in the TDLR filing.

When is the Post WWTP project targeted for completion?

The project filing states that construction is targeted for October 2027, following a start date in June 2026.

Who is the design firm for the Post WWTP project?

Parkhill is the design firm of record for this project, with Jorge Campos identified as the contact person.

Is the Post WWTP project open to the public?

No, this is a new construction project in the planning and building phase, not an open business location.

What is the square footage of the new treatment plant?

The new mechanical wastewater treatment plant and administrative building cover a total site area of 3,531 square feet.

What is City of Post WWTP?

City of Post WWTP is a new construction project at 105 E. Main Street in Post, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new mechanical wastewater treatment plant which includes Lift Station, Screening, Aeration Basins, Clarifiers, Phosphorus Removal System, Disinfection Equipment, Sludge Dewatering Equipment, Discharge Structures, and Ad…

Is City of Post WWTP open in Post?

City of Post WWTP is still under construction in Post, TX, with an estimated completion of Oct 2027 according to its TDLR registration.

Where is City of Post WWTP located?

City of Post WWTP is located at 105 E. Main Street, Post, TX, 79356, in Garza County.

Who is the owner or developer of City of Post WWTP?

City of Post is the property owner/developer of record for City of Post WWTP, per its TDLR project registration.

Who is the architect or design firm for City of Post WWTP?

Parkhill (Jorge Campos)as is the design firm of record for City of Post WWTP, according to its TDLR filing.

How much does City of Post WWTP cost and how big is it?

City of Post WWTP has an estimated construction value of $12.0M and approximately 3,531 square feet (about $3.40K/sqft), based on its TDLR filing.

Scope of Work

Construction of a new mechanical wastewater treatment plant which includes Lift Station, Screening, Aeration Basins, Clarifiers, Phosphorus Removal System, Disinfection Equipment, Sludge Dewatering Equipment, Discharge Structures, and Admin. Building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

105 E. Main Street, Post, TX, 79356

Loading location map…
33.19077, -101.37814

Watch all construction in 79356 (Post)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.