Post, TX Construction Projects

What's being built in Post22 projects on file from Texas public records

22
Total Projects
$26.0M
Total Investment
8
New Construction
14
Renovations
113K
Total Sq Ft
$1.2M
Avg. Value

What is being built in Post, Texas?

Post, Texas has 22 construction and development projects on file worth $26.0M — 8 new construction and 14 renovations or remodels. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Post?

The most recently filed new-construction projects in Post are City of Post WWTP ($12.0M), Post, TX TRT 27050 ($210K), Post Laundromat ($883K), GCHD Physical Therapy Facility ($1.1M). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

Garza County Economy

Driving Post construction · FRED

Unemployment:5.4%
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 22 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Post
Estimated construction value$26MSum of 22 shown records with value
Records in view22 / 22Ready to inspect and compare
Largest record’s share46.2%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value · Smaller records grouped
Post

Comparisons use only these 22 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Post, Texas

Post is experiencing significant construction and development activity with 22 registered projects valued at $26.0M. The city's development portfolio includes 8 new construction projects and 14 renovation projects, representing 113,107 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 8 new construction projects (36%)
  • 14 renovation/remodel projects (64%)
  • Average project value: $1.2M

Key Players

Post's construction market features 5 major property owners and 5 active design firms driving development across the city.

Leading developers include City of Post and POST ISD, working with architecture firms such as BGR ARCHITECTS and Parkhill (Jorge Campos)as.

Our database tracks all TDLR-registered construction projects in Post. Projects span Garza counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Post and the surrounding area.

All Projects

22 TDLR · 0 Site Plans

Showing 20 of 22 listed TDLR filings

Registered
$12.0M

City of Post WWTP

105 E. Main Street, Post, TX 79356

3,531 sqftMar 17, 2026
Inspection Complete
$750K

Turf Replacement

501 S. Ave K, Post, TX 79356

83,297 sqftMar 6, 2026
Closed
$883K

Post Laundromat

303 S. Broadway St., Post, TX 79356

3,532 sqftJun 29, 2023
Closed
$300K

Post Splash Pad

101 East 3rd, Post, TX 79356

3,000 sqftJul 6, 2021

Post construction questions

How many construction projects are there in Post, Texas?
There are 22 registered construction projects in Post, Texas with a total estimated value of $26.0M and 113,107 square feet of development. The average project is valued at $1.2M.
What kind of construction is happening in Post?
Post has 8 new construction projects (36%) and 14 renovation or remodel projects (64%) on file, together totaling 113,107 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Post?
The most active property owners on file in Post are City of Post, POST ISD, POST INDEPENDENT SCHOOL DISTRICT. The architecture and design firms appearing most often on Post filings are BGR ARCHITECTS, Parkhill (Jorge Campos)as, INTERPLAN ARCHITECTS, INC..
Where does this Post construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Post filings themselves and change as new records are registered. How Zabalist sources Texas construction records.